Insulation of the Housing House (Kuban) 388 (Q75978): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): A 388 apartment panel 12 housing units was built around 1979. The house currently does not meet the requirements of energy performance. The broken links between the panels and the fall are aesthetically unaesthetically between the already revitalised houses of the nearby surrounding area. Project implementation will increase the energy efficiency of the building, reduce the consumption of total energy supplied by 54.69 %. An energy performance...)
(‎Created claim: summary (P836): The Kunín 388 panel house with 12 apartment units was built approximately in 1979. The house currently does not meet the requirements of energy performance. Cracked connections between panels and fallen plaster act unestically among already revitalised houses near the surrounding area. Implementation of the project will increase the energy efficiency of the house, reduce the total energy consumption by 54.69 %. By insulation of the house envelop...)
Property / summary
 
The Kunín 388 panel house with 12 apartment units was built approximately in 1979. The house currently does not meet the requirements of energy performance. Cracked connections between panels and fallen plaster act unestically among already revitalised houses near the surrounding area. Implementation of the project will increase the energy efficiency of the house, reduce the total energy consumption by 54.69 %. By insulation of the house envelope, the energy intensity class will be shifted from the current E level to stage C. SC 2.5 will be met. (English)
Property / summary: The Kunín 388 panel house with 12 apartment units was built approximately in 1979. The house currently does not meet the requirements of energy performance. Cracked connections between panels and fallen plaster act unestically among already revitalised houses near the surrounding area. Implementation of the project will increase the energy efficiency of the house, reduce the total energy consumption by 54.69 %. By insulation of the house envelope, the energy intensity class will be shifted from the current E level to stage C. SC 2.5 will be met. (English) / rank
 
Normal rank
Property / summary: The Kunín 388 panel house with 12 apartment units was built approximately in 1979. The house currently does not meet the requirements of energy performance. Cracked connections between panels and fallen plaster act unestically among already revitalised houses near the surrounding area. Implementation of the project will increase the energy efficiency of the house, reduce the total energy consumption by 54.69 %. By insulation of the house envelope, the energy intensity class will be shifted from the current E level to stage C. SC 2.5 will be met. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:13, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Insulation of the Housing House (Kuban) 388
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,266,690.3 Czech koruna
    0 references
    50,667.61 Euro
    1 October 2020
    0 references
    4,222,301.0 Czech koruna
    0 references
    168,892.04 Euro
    1 October 2020
    0 references
    30 percent
    0 references
    21 February 2017
    0 references
    31 August 2018
    0 references
    31 August 2018
    0 references
    Stavební bytové družstvo Venkov
    0 references
    0 references

    49°36'30.2"N, 18°0'3.6"E
    0 references
    74242
    0 references
    Panelový dům Kunín 388 s 12 bytovými jednotkami byl postaven přibližně v roce 1979. Dům v současné době nesplňuje požadavky energetické náročnosti. Popraskané spoje mezi panely a opadaná omítka působí neesteticky mezi již revitalizovanými domy blízkého okolí. Realizace projektu zvýší energetickou účinnost domu, sníží spotřebu celkové dodané energie o 54,69% . Zateplením obálky domu bude třída energetické náročnosti posunuta ze stávajícího stupně E do stupně C. SC 2.5 bude splněn. (Czech)
    0 references
    The Kunín 388 panel house with 12 apartment units was built approximately in 1979. The house currently does not meet the requirements of energy performance. Cracked connections between panels and fallen plaster act unestically among already revitalised houses near the surrounding area. Implementation of the project will increase the energy efficiency of the house, reduce the total energy consumption by 54.69 %. By insulation of the house envelope, the energy intensity class will be shifted from the current E level to stage C. SC 2.5 will be met. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0006478
    0 references