Increase in the resilience of the YSDH Yart fire brigade to the effects of emergencies (Q74373): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The output of the project is the reconstruction of the fire brigade in the Skutta. This is the case for ODA Chrudim, i.e. an area of exposure to climate change related to climate change — ploughing and windstorms, extreme drought, excessive snowfall and massive icing. Therefore, the project plan was designed in such a way as to make the building more resilient to the effects of these emergencies and to make the IZS more operational., remove_ol...) |
(Created claim: summary (P836): As a result of the project is the reconstruction of the fire brigade in Skutč. This is located in the ORP Chrudim, i.e. exposed territory in which the following climatic phenomena are associated with climate change – orcs and windstorms, extreme droughts, above-average snowfalls and massive icing. Therefore, the project plan was designed in such a way that individual construction works would lead to the building’s resistance to the effects of th...) |
||||||||||||||
Property / summary | |||||||||||||||
As a result of the project is the reconstruction of the fire brigade in Skutč. This is located in the ORP Chrudim, i.e. exposed territory in which the following climatic phenomena are associated with climate change – orcs and windstorms, extreme droughts, above-average snowfalls and massive icing. Therefore, the project plan was designed in such a way that individual construction works would lead to the building’s resistance to the effects of the incidents and thus the ICT component was more capable of action. (English) | |||||||||||||||
Property / summary: As a result of the project is the reconstruction of the fire brigade in Skutč. This is located in the ORP Chrudim, i.e. exposed territory in which the following climatic phenomena are associated with climate change – orcs and windstorms, extreme droughts, above-average snowfalls and massive icing. Therefore, the project plan was designed in such a way that individual construction works would lead to the building’s resistance to the effects of the incidents and thus the ICT component was more capable of action. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As a result of the project is the reconstruction of the fire brigade in Skutč. This is located in the ORP Chrudim, i.e. exposed territory in which the following climatic phenomena are associated with climate change – orcs and windstorms, extreme droughts, above-average snowfalls and massive icing. Therefore, the project plan was designed in such a way that individual construction works would lead to the building’s resistance to the effects of the incidents and thus the ICT component was more capable of action. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 22:03, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase in the resilience of the YSDH Yart fire brigade to the effects of emergencies |
Project in Czech Republic financed by DG Regio |
Statements
23,906,420.0 Czech koruna
0 references
28,125,200.0 Czech koruna
0 references
85 percent
0 references
5 February 2016
0 references
30 November 2018
0 references
30 November 2018
0 references
Město Skuteč
0 references
53973
0 references
Výstupem projektu je rekonstrukce hasičské zbrojnice ve Skutči. Tato se nachází v ORP Chrudim, tedy exponovaném území, ve kterém se vyskytují následující klimatické jevy související se změnou klimatu - orkány a větrné smrště, extrémní sucha, nadprůměrné sněhové srážky a masivní námrazy. Proto byl projektový záměr sestaven tak, aby jednotlivé stavební práce vedly k zodolnění budovy vůči účinkům vlivů uvedených mimořádných událostí a složka IZS tak byla více akceschopná. (Czech)
0 references
As a result of the project is the reconstruction of the fire brigade in Skutč. This is located in the ORP Chrudim, i.e. exposed territory in which the following climatic phenomena are associated with climate change – orcs and windstorms, extreme droughts, above-average snowfalls and massive icing. Therefore, the project plan was designed in such a way that individual construction works would lead to the building’s resistance to the effects of the incidents and thus the ICT component was more capable of action. (English)
23 October 2020
0 references
Identifiers
CZ.06.1.23/0.0/0.0/16_055/0002861
0 references