Reduced energy performance of the gymnasiums of the School and Primary School (Q72563): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The objective of the proposed project is to reduce the energy performance of the building of the gymnasiums and Nursery School Oporto in Nádražní 296, 517 73 Opočno. The user of the object and the grant applicant are the Secondary School and the Primary School, New City of Metering, the Budget Organisation of KHK. The following measures are proposed as a technical solution to the reconstruction: the complete insulation of the envelope of the...)
(‎Created claim: summary (P836): The subject of the proposed project is to reduce the energy performance of the gymnasium at the Opočno gymnasium at Nádražní 296, 517 73 Opočno. The user of the building and the applicant for the subsidy is the Secondary School and the Primary School, Nové Město nad Metují, the KHK budget organisation. The following measures are proposed within the technical solution of the reconstruction: complete insulation of the building envelope, replaceme...)
Property / summary
 
The subject of the proposed project is to reduce the energy performance of the gymnasium at the Opočno gymnasium at Nádražní 296, 517 73 Opočno. The user of the building and the applicant for the subsidy is the Secondary School and the Primary School, Nové Město nad Metují, the KHK budget organisation. The following measures are proposed within the technical solution of the reconstruction: complete insulation of the building envelope, replacement of opening fillings, replacement of existing lighting and implementation of energy management. The object is not listed. (English)
Property / summary: The subject of the proposed project is to reduce the energy performance of the gymnasium at the Opočno gymnasium at Nádražní 296, 517 73 Opočno. The user of the building and the applicant for the subsidy is the Secondary School and the Primary School, Nové Město nad Metují, the KHK budget organisation. The following measures are proposed within the technical solution of the reconstruction: complete insulation of the building envelope, replacement of opening fillings, replacement of existing lighting and implementation of energy management. The object is not listed. (English) / rank
 
Normal rank
Property / summary: The subject of the proposed project is to reduce the energy performance of the gymnasium at the Opočno gymnasium at Nádražní 296, 517 73 Opočno. The user of the building and the applicant for the subsidy is the Secondary School and the Primary School, Nové Město nad Metují, the KHK budget organisation. The following measures are proposed within the technical solution of the reconstruction: complete insulation of the building envelope, replacement of opening fillings, replacement of existing lighting and implementation of energy management. The object is not listed. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:50, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduced energy performance of the gymnasiums of the School and Primary School
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,643,823.48 Czech koruna
    0 references
    105,752.94 Euro
    10 January 2020
    0 references
    6,609,558.7 Czech koruna
    0 references
    264,382.35 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    3 May 2018
    0 references
    29 February 2020
    0 references
    Střední průmyslová škola, Odborná škola a Základní škola, Nové Město nad Metují
    0 references
    0 references

    50°21'5.36"N, 16°8'48.59"E
    0 references
    54901
    0 references
    Předmětem navrhovaného projektu je snížení energetické náročnosti budovy tělocvičny SŠ a ZŠ Opočno na adrese Nádražní 296, 517 73 Opočno. Uživatelem objektu a zároveň žadatelem o dotaci je Střední škola a Základní škola, Nové Město nad Metují, rozpočtová organizace KHK. V rámci technického řešení rekonstrukce jsou navržena tato opatření: kompletní zateplení obálky budovy, výměna výplní otvorů, výměna stávajícího osvětlení a zavedení energetického managementu. Objekt není památkově chráněn. (Czech)
    0 references
    The subject of the proposed project is to reduce the energy performance of the gymnasium at the Opočno gymnasium at Nádražní 296, 517 73 Opočno. The user of the building and the applicant for the subsidy is the Secondary School and the Primary School, Nové Město nad Metují, the KHK budget organisation. The following measures are proposed within the technical solution of the reconstruction: complete insulation of the building envelope, replacement of opening fillings, replacement of existing lighting and implementation of energy management. The object is not listed. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001920
    0 references