Hot drying U U Kolaplastka, Česká Třebová (Q72507): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The insulation of the building envelope, the insulation of the roof, the replacement of the roof filling, the installation of energy saving and the new heating system that will be cleared will be carried out. In addition, energy management will be introduced. The building is located on No st.3338/1, Č.p. 610 Česká Třebová., remove_old_english_translation)
(‎Created claim: summary (P836): Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and a new heating system will be implemented, which will be regulated. Energy management will also be introduced. The building is located on p.č. st.3338/1, No.610 Česká Třebová, translated_summary)
Property / summary
 
Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and a new heating system will be implemented, which will be regulated. Energy management will also be introduced. The building is located on p.č. st.3338/1, No.610 Česká Třebová (English)
Property / summary: Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and a new heating system will be implemented, which will be regulated. Energy management will also be introduced. The building is located on p.č. st.3338/1, No.610 Česká Třebová (English) / rank
 
Normal rank
Property / summary: Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and a new heating system will be implemented, which will be regulated. Energy management will also be introduced. The building is located on p.č. st.3338/1, No.610 Česká Třebová (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:48, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Hot drying U U Kolaplastka, Česká Třebová
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,340,221.6 Czech koruna
    0 references
    93,608.86 Euro
    10 January 2020
    0 references
    5,850,554.0 Czech koruna
    0 references
    234,022.16 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    29 May 2017
    0 references
    28 February 2019
    0 references
    Město Česká Třebová
    0 references
    0 references
    0 references

    49°54'12.31"N, 16°26'29.65"E
    0 references
    56002
    0 references
    Bude realizováno zateplení obvodového pláště budovy, zateplení střechy, výměna otvorových výplní, instalace vzduchotechniky s rekuperací a nová otopná soustava, která bude vyregulována. Dále bude zaveden energetický management. Budova se nachází na p.č. st.3338/1, č.p.610 Česká Třebová (Czech)
    0 references
    Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and a new heating system will be implemented, which will be regulated. Energy management will also be introduced. The building is located on p.č. st.3338/1, No.610 Česká Třebová (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001836
    0 references