D1 Modernisation — Branch 03, EXIT 29 Hedged — EXIT 34 Centre (Stage 2) _1 (Q72429): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project concerns the modernisation of the D1 motorway in the section Hdowska — Centre (km 29,500-34,140) of 4.640 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this...) |
(Created claim: summary (P836): The object of the project is modernisation of the D1 motorway in the section Hvězdonice – Ostředek (km 29.500-34.140) in the length of 4.640 km.. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication a...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is modernisation of the D1 motorway in the section Hvězdonice – Ostředek (km 29.500-34.140) in the length of 4.640 km.. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) | |||||||||||||||
Property / summary: The object of the project is modernisation of the D1 motorway in the section Hvězdonice – Ostředek (km 29.500-34.140) in the length of 4.640 km.. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is modernisation of the D1 motorway in the section Hvězdonice – Ostředek (km 29.500-34.140) in the length of 4.640 km.. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:44, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | D1 Modernisation — Branch 03, EXIT 29 Hedged — EXIT 34 Centre (Stage 2) _1 |
Project in Czech Republic financed by DG Regio |
Statements
494,823,866.25 Czech koruna
0 references
588,858,715.0 Czech koruna
0 references
84.03 percent
0 references
1 January 2016
0 references
31 May 2017
0 references
31 May 2017
0 references
Ředitelství silnic a dálnic ČR
0 references
14000
0 references
Předmětem projektu je modernizace dálnice D1 v úseku Hvězdonice - Ostředek (km 29,500 - 34,140) v délce 4,640 km.. Vlastní modernizace spočívá v rozšíření na kategorii D 28, resp. 2 jízdní pásy o šířce zpevnění 11,5 m a zlepšení stavebně technického stavu dálnice. Tyto úpravy přispějí k podstatnému zvýšení bezpečnosti a plynulosti provozu na této značně zatížené komunikaci a rovněž i k oddálení běžných oprav. (Czech)
0 references
The object of the project is modernisation of the D1 motorway in the section Hvězdonice – Ostředek (km 29.500-34.140) in the length of 4.640 km.. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English)
23 October 2020
0 references
Identifiers
CZ.04.2.39/0.0/0.0/16_007/0000013
0 references