D1 Modernisation — Branch 10, EXIT 75 Hořice — EXIT 81 (Q72414): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project concerns the modernisation of the D1 motorway on Hořice — Kobrovice (km 75,920-82,417) of 6.497 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily l...)
Property / summary
The project concerns the modernisation of the D1 motorway on Hořice — Kobrovice (km 75,920-82,417) of 6.497 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily loaded communication, as well as to delay the current corrections. (English)
 
Property / summary: The project concerns the modernisation of the D1 motorway on Hořice — Kobrovice (km 75,920-82,417) of 6.497 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily loaded communication, as well as to delay the current corrections. (English) / rank
Normal rank
 

Revision as of 21:44, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D1 Modernisation — Branch 10, EXIT 75 Hořice — EXIT 81
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    908,751,391.4 Czech koruna
    0 references
    36,350,055.66 Euro
    10 January 2020
    0 references
    1,120,435,217.0 Czech koruna
    0 references
    44,817,408.68 Euro
    10 January 2020
    0 references
    81.11 percent
    0 references
    1 April 2017
    0 references
    28 March 2019
    0 references
    30 June 2019
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je modernizace dálnice D1 v úseku Hořice - Koberovice (km 75,920 - 82,417) v délce 6,497 km. Vlastní modernizace spočívá v rozšíření na kategorii D 28, resp. 2 jízdní pásy o šířce zpevnění 11,5 m a zlepšení stavebně technického stavu dálnice. Tyto úpravy přispějí k podstatnému zvýšení bezpečnosti a plynulosti provozu na této značně zatížené komunikaci a rovněž i k oddálení běžných oprav. (Czech)
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_003/0000093
    0 references