(Removed claim: summary (P836): The subject of the project is the modernisation of the D1 motorway on the Grand Bíteš — Dephrases of a cross (km 162,750-168,170) of a length of 5.420 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the s...) |
(Created claim: summary (P836): The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communica...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) | |||||||||||||||
Property / summary: The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:43, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | D1 Modernisation — Branch 22, EXIT 162 Great Bíteš — EXIT 168 |
Project in Czech Republic financed by DG Regio |
Statements
768,495,713.4 Czech koruna
0 references
911,863,444.0 Czech koruna
0 references
84.28 percent
0 references
8 April 2016
0 references
20 November 2017
0 references
30 November 2017
0 references
Ředitelství silnic a dálnic ČR
0 references
14000
0 references
Předmětem projektu je modernizace dálnice D1 v úseku Velká Bíteš - Devět křížů (km 162,750 - 168,170) v délce 5,420 km. Vlastní modernizace spočívá v rozšíření na kategorii D 28, resp. 2 jízdní pásy o šířce zpevnění 11,5 m a zlepšení stavebně technického stavu dálnice. Tyto úpravy přispějí k podstatnému zvýšení bezpečnosti a plynulosti provozu na této značně zatížené komunikaci a rovněž i k oddálení běžných oprav. (Czech)
0 references
The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English)
23 October 2020
0 references
Identifiers
CZ.04.2.39/0.0/0.0/15_003/0000044