Q72376 (Q72376): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emission...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 21:43, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
907,441,408.54 Czech koruna
0 references
1,525,111,611.0 Czech koruna
0 references
59.5 percent
0 references
13 December 2016
0 references
18 August 2021
0 references
Ředitelství silnic a dálnic ČR
0 references
14000
0 references
Předmětem projektu je výstavba dálnice D3 v úseku 0309/II Ševětín - Borek. Jedná se o rozšíření stávající silnice I/3, která již byla vybudována jako poloviční profil dálnice, na dálniční profil kategorie D 27,5/120 v délce 10,680 km. Realizací výstavby dálnice D3 dojde k podstatnému zlepšení plynulosti dopravy a zvýšení bezpečnosti provozu. Z hlediska životního prostředí, plynulým provozem dojde ke snížení celkových emisí z dopravy v okolí stávající komunikace. (Czech)
0 references
The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English)
23 October 2020
0 references
Identifiers
CZ.04.2.39/0.0/0.0/15_002/0000084
0 references