Q72373 (Q72373): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The object of the project is the construction of the D3 motorway category D 27,5/120 in the section 0309/I Bošilec – Ševětín with a total length of 8.137 km. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road., translated_summary)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Motorway D3, construction 0309/I Bošilec — Ševetín_1

Revision as of 21:43, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    989,244,647.37 Czech koruna
    0 references
    39,569,785.89 Euro
    10 January 2020
    0 references
    1,662,596,046.0 Czech koruna
    0 references
    66,503,841.84 Euro
    10 January 2020
    0 references
    59.5 percent
    0 references
    24 February 2016
    0 references
    29 February 2020
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba dálnice D3 kategorie D 27,5/120 v úseku 0309/I Bošilec - Ševětín o celkové délce 8,137 km. Realizací výstavby dálnice D3 dojde k podstatnému zlepšení plynulosti dopravy a zvýšení bezpečnosti provozu. Z hlediska životního prostředí, plynulým provozem dojde ke snížení celkových emisí z dopravy v okolí stávající komunikace. (Czech)
    0 references
    The object of the project is the construction of the D3 motorway category D 27,5/120 in the section 0309/I Bošilec – Ševětín with a total length of 8.137 km. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_002/0000056
    0 references