Q72367 (Q72367): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project “Knot Pilsen, 1st construction – reconstruction of Prague head” is one of the elements of the modernisation of the TEN-T network. TŽK is not only a significant national link, but also a transit link from Germany to Slovakia. The aim of the construction is to provide basic parameters of modernised lines including modernisation of communication and signalling equipment and overhead contact lines. The implementation of the project is co...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 21:43, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
547,662,761.48 Czech koruna
0 references
843,005,536.0 Czech koruna
0 references
64.97 percent
0 references
1 January 2016
0 references
30 June 2018
0 references
30 June 2018
0 references
Správa železniční dopravní cesty, státní organizace
0 references
11000
0 references
Projekt "Uzel Plzeň, 1. stavba - přestavba pražského zhlaví" je jedním z prvků modernizace sítě TEN-T. Leží v trase III. TŽK a představuje nejen významné vnitrostátní spojení, ale také tranzitní spojení z Německa na Slovensko. Cílem stavby je zajistit základní parametry modernizovaných tratí včetně modernizace sdělovacího a zabezpečovacího zařízení a trakčního vedení. Realizace projektu je soustředěna do lokalit osobního nádraží, kolejiště Lobzy a seřaďovacího nádraží. (Czech)
0 references
The project “Knot Pilsen, 1st construction – reconstruction of Prague head” is one of the elements of the modernisation of the TEN-T network. TŽK is not only a significant national link, but also a transit link from Germany to Slovakia. The aim of the construction is to provide basic parameters of modernised lines including modernisation of communication and signalling equipment and overhead contact lines. The implementation of the project is concentrated in the localities of the passenger station, the Lobzy rail yard and the marshalling station. (English)
23 October 2020
0 references
Identifiers
CZ.04.1.41/0.0/0.0/16_031/0000038
0 references