Q75131 (Q75131): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The object of the project is the reconstruction of road II/420 in the delay of the villages Dolní Věstonice and reconstruction of the bridge No. 420-012 in the subsequent extravaganza section. The reconstructed section of the road begins in the directional arch in front of the bridge no. 420-012 and ends behind the village near DZ IZ4b towards Mikulov. The total length of the reconstruction of road II/420 is 0.866 km. The relevant section of the...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 21:42, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
35,144,498.73 Czech koruna
0 references
41,346,469.1 Czech koruna
0 references
85.0 percent
0 references
31 December 2020
0 references
Správa a údržba silnic Jihomoravského kraje, příspěvková organizace kraje
0 references
60200
0 references
Předmětem projektu je rekonstrukce silnice II/420 v průtahu obcí Dolní Věstonice a rekonstrukce mostu ev. č. 420-012 v navazujícím extravilánovém úseku. Rekonstruovaný úsek komunikace začíná ve směrovém oblouku před mostem ev. č. 420-012 a končí za obcí u DZ IZ4b konec obce směrem na Mikulov. Celková délka rekonstrukce silnice II/420 je 0,866 km. Předmětný úsek komunikace je součástí Prioritní regionální silniční sítě, vymezené podle kritérií uvedených v Programovém dokumentu IROP. (Czech)
0 references
The object of the project is the reconstruction of road II/420 in the delay of the villages Dolní Věstonice and reconstruction of the bridge No. 420-012 in the subsequent extravaganza section. The reconstructed section of the road begins in the directional arch in front of the bridge no. 420-012 and ends behind the village near DZ IZ4b towards Mikulov. The total length of the reconstruction of road II/420 is 0.866 km. The relevant section of the communication is part of the Priority Regional Road Network, defined according to the criteria set out in the IROP Programming Document. (English)
23 October 2020
0 references
Identifiers
CZ.06.1.42/0.0/0.0/17_082/0010113
0 references