Energy saving through the replacement of the CNOC of the INTEGREX 200 2SY process (Q16447): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item: Label in wikidata changed)
label / enlabel / en
 
Energy saving through the replacement of the CNOC of the INTEGREX 200 2SY process

Revision as of 19:39, 17 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy saving through the replacement of the CNOC of the INTEGREX 200 2SY process
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,965,950.0 Czech koruna
    0 references
    118,638.0 Euro
    10 January 2020
    0 references
    9,886,500.0 Czech koruna
    0 references
    395,460.0 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    31 December 2020
    0 references
    INPROMA, spol. s r.o.
    0 references
    0 references

    50°15'49.32"N, 15°7'56.75"E
    0 references
    28933
    0 references
    Cílem projektu je instalace nového CNC obráběcího centra, izolace páteřního rozvodu vytápění, dále výměna původního zářivkového osvětlení v halách společnosti INPROMA, spol. s.r.o. a venkovního osvětlení. Projekt spadá do oblasti CZ-NACE 28290 Výroba ostatních strojů a zařízení pro všeobecné účely j. n. Místem je p. č. st. 512 v katastrálním území Křinec. Budovy jsou v majetku společnosti. Realizací projektu dojde ke snížení emisí CO2 a k trvalému snížení spotřeby energie. a. (Czech)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013803
    0 references