5.1a — Energy — austerity measures on v/v Lutín Primary School (Q74070): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at energy-efficient renovation of the primary school in the municipality of Lutín. This is the Š building at the following address: ul. School No 80, Lutín 783 49, parcel No. 101, cadastral area Lutín [689122]. The measure is based on the insulation of the vertical and horizontal structures of the replacement of the selector. The measure includes controlled ventilation with recuperation. Is this a comprehensive project to redu...) |
(Created claim: summary (P836): The project is focused on energy-saving renovation of the primary school in the municipality of Lutín. This is the primary school building at the address of ul. School No. 80, Lutín 783 49, Lot No. 101, cadastral territory of Lutín [689122]. The basis of the measure is to insulate vertical and horizontal structures by replacing hole fillings. The measure includes controlled ventilation with recuperation. This is a comprehensive project to reduce...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is focused on energy-saving renovation of the primary school in the municipality of Lutín. This is the primary school building at the address of ul. School No. 80, Lutín 783 49, Lot No. 101, cadastral territory of Lutín [689122]. The basis of the measure is to insulate vertical and horizontal structures by replacing hole fillings. The measure includes controlled ventilation with recuperation. This is a comprehensive project to reduce the energy performance of a building combined on two applications?. (English) | |||||||||||||||
Property / summary: The project is focused on energy-saving renovation of the primary school in the municipality of Lutín. This is the primary school building at the address of ul. School No. 80, Lutín 783 49, Lot No. 101, cadastral territory of Lutín [689122]. The basis of the measure is to insulate vertical and horizontal structures by replacing hole fillings. The measure includes controlled ventilation with recuperation. This is a comprehensive project to reduce the energy performance of a building combined on two applications?. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is focused on energy-saving renovation of the primary school in the municipality of Lutín. This is the primary school building at the address of ul. School No. 80, Lutín 783 49, Lot No. 101, cadastral territory of Lutín [689122]. The basis of the measure is to insulate vertical and horizontal structures by replacing hole fillings. The measure includes controlled ventilation with recuperation. This is a comprehensive project to reduce the energy performance of a building combined on two applications?. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:27, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | 5.1a — Energy — austerity measures on v/v Lutín Primary School |
Project in Czech Republic financed by DG Regio |
Statements
9,280,750.08 Czech koruna
0 references
23,201,875.2 Czech koruna
0 references
40 percent
0 references
30 April 2022
0 references
Obec Lutín
0 references
78349
0 references
Projekt je zaměřen na energeticky úspornou renovaci základní školy v obci Lutín. Jedná se o budovu ZŠ na adrese ul. Školní č. p. 80, Lutín 783 49, parcela č. st. 101, katastrální území Lutín [689122]. Základem opatření je zateplení svislých a vodorovných konstrukcí výměna otvorových výplní. Součástí opatření je řízené větrání s rekuperací. Jedná se komplexní projekt ke snížení energetické náročnosti budovy kombinovaný na dvou žádostech?. (Czech)
0 references
The project is focused on energy-saving renovation of the primary school in the municipality of Lutín. This is the primary school building at the address of ul. School No. 80, Lutín 783 49, Lot No. 101, cadastral territory of Lutín [689122]. The basis of the measure is to insulate vertical and horizontal structures by replacing hole fillings. The measure includes controlled ventilation with recuperation. This is a comprehensive project to reduce the energy performance of a building combined on two applications?. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/18_100/0009520
0 references