Insulation of the College of Motiště Primary School (Q72274): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the project is the realisation of energy savings at the premises of the nursery school in the site — part No 163, No 127, in the cadastral district of the cadastral district of the cadastral district of the cadastral district. Mifti in Greater Meziříčí (699853). The insulation of the wall walls, the insulation of the roof structure and, in accordance with the conditions of the Environment Operational Programme, the operation of...)
(‎Created claim: summary (P836): The object of the project is to realise energy savings in the building of the kindergarten in Mostiště – parc. no. 163, No. Bridge at Velké Meziříčí (699853). Insulation of the perimeter walls, insulation of the roof structure and in accordance with the conditions of the OPE for the implementation of the forced ventilation system of the relevant premises of the building and for construction reasons also for the replacement of 2 existing windows...)
Property / summary
 
The object of the project is to realise energy savings in the building of the kindergarten in Mostiště – parc. no. 163, No. Bridge at Velké Meziříčí (699853). Insulation of the perimeter walls, insulation of the roof structure and in accordance with the conditions of the OPE for the implementation of the forced ventilation system of the relevant premises of the building and for construction reasons also for the replacement of 2 existing windows will be carried out. An improvement of the thermal-technical parameters of the object will be achieved comprehensively. (English)
Property / summary: The object of the project is to realise energy savings in the building of the kindergarten in Mostiště – parc. no. 163, No. Bridge at Velké Meziříčí (699853). Insulation of the perimeter walls, insulation of the roof structure and in accordance with the conditions of the OPE for the implementation of the forced ventilation system of the relevant premises of the building and for construction reasons also for the replacement of 2 existing windows will be carried out. An improvement of the thermal-technical parameters of the object will be achieved comprehensively. (English) / rank
 
Normal rank
Property / summary: The object of the project is to realise energy savings in the building of the kindergarten in Mostiště – parc. no. 163, No. Bridge at Velké Meziříčí (699853). Insulation of the perimeter walls, insulation of the roof structure and in accordance with the conditions of the OPE for the implementation of the forced ventilation system of the relevant premises of the building and for construction reasons also for the replacement of 2 existing windows will be carried out. An improvement of the thermal-technical parameters of the object will be achieved comprehensively. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:24, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Insulation of the College of Motiště Primary School
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    873,588.4 Czech koruna
    0 references
    34,943.54 Euro
    10 January 2020
    0 references
    2,183,971.0 Czech koruna
    0 references
    87,358.84 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    22 May 2017
    0 references
    4 September 2017
    0 references
    31 January 2019
    0 references
    Město Velké Meziříčí
    0 references
    0 references
    0 references

    49°21'11.99"N, 16°0'47.20"E
    0 references
    59401
    0 references
    Předmětem projektu je realizace úspor energie v objektu mateřské školy v Mostišti - parc. č. 163, č.p. Mostiště 127, k.ú. Mostiště u Velkého Meziříčí (699853). Bude provedeno zateplení obvodových stěn, dále zateplení střešní konstrukce a v souladu s podmínkami OPŽP k realizaci systému nuceného větrání příslušných prostor uvedeného objektu a z konstrukčně stavebních důvodu též k výměně 2 stávajících oken. Komplexně bude dosaženo zlepšení tepelně-technických parametrů objektu. (Czech)
    0 references
    The object of the project is to realise energy savings in the building of the kindergarten in Mostiště – parc. no. 163, No. Bridge at Velké Meziříčí (699853). Insulation of the perimeter walls, insulation of the roof structure and in accordance with the conditions of the OPE for the implementation of the forced ventilation system of the relevant premises of the building and for construction reasons also for the replacement of 2 existing windows will be carried out. An improvement of the thermal-technical parameters of the object will be achieved comprehensively. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001675
    0 references