Increase in capacity of the Nymburk — Mladá Boleslav line, 1st stavb_1 (Q72131): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The Nymburk railway line, Mladá Boleslav hl.n. (line number 071, according to the numbering of the timetables) is part of the national rail system and covers both passenger and freight rail services. The aim of the building is to increase the capacity of one of the most heavily burdened single track in the Czech Republic. The main thrust of the construction is to respond in particular to the increased demand for car traffic, which, already tod...) |
(Created claim: summary (P836): The railway line Nymburk – Mladá Boleslav hl.n. (line number 071, according to timetable numbering) is part of the national railway and serves both passenger and freight rail transport. The aim of the construction is to increase the capacity of one of the most heavily loaded single-track lines in the Czech Republic. The main purpose of the construction is to respond mainly to the increased demand for transport of cars, which in today’s scope alr...) |
||||||||||||||
Property / summary | |||||||||||||||
The railway line Nymburk – Mladá Boleslav hl.n. (line number 071, according to timetable numbering) is part of the national railway and serves both passenger and freight rail transport. The aim of the construction is to increase the capacity of one of the most heavily loaded single-track lines in the Czech Republic. The main purpose of the construction is to respond mainly to the increased demand for transport of cars, which in today’s scope already significantly burdens the line in terms of permeability. (English) | |||||||||||||||
Property / summary: The railway line Nymburk – Mladá Boleslav hl.n. (line number 071, according to timetable numbering) is part of the national railway and serves both passenger and freight rail transport. The aim of the construction is to increase the capacity of one of the most heavily loaded single-track lines in the Czech Republic. The main purpose of the construction is to respond mainly to the increased demand for transport of cars, which in today’s scope already significantly burdens the line in terms of permeability. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The railway line Nymburk – Mladá Boleslav hl.n. (line number 071, according to timetable numbering) is part of the national railway and serves both passenger and freight rail transport. The aim of the construction is to increase the capacity of one of the most heavily loaded single-track lines in the Czech Republic. The main purpose of the construction is to respond mainly to the increased demand for transport of cars, which in today’s scope already significantly burdens the line in terms of permeability. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:17, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase in capacity of the Nymburk — Mladá Boleslav line, 1st stavb_1 |
Project in Czech Republic financed by DG Regio |
Statements
729,440,278.84 Czech koruna
0 references
907,438,970.0 Czech koruna
0 references
80.38 percent
0 references
14 October 2015
0 references
3 November 2016
0 references
3 May 2017
0 references
Správa železniční dopravní cesty, státní organizace
0 references
11000
0 references
Železniční trať Nymburk - Mladá Boleslav hl.n. (číslo trati 071, dle číslování jízdních řádů) je součástí celostátní dráhy a slouží osobní i nákladní železniční dopravě. Cílem stavby je zvýšení kapacity jedné z nejvíce zatížených jednokolejných tratí na území ČR. Hlavním smyslem stavby je reagovat především na zvýšenou poptávku po přepravách automobilů, která již v dnešním rozsahu trať z hlediska propustnosti výrazně zatěžuje. (Czech)
0 references
The railway line Nymburk – Mladá Boleslav hl.n. (line number 071, according to timetable numbering) is part of the national railway and serves both passenger and freight rail transport. The aim of the construction is to increase the capacity of one of the most heavily loaded single-track lines in the Czech Republic. The main purpose of the construction is to respond mainly to the increased demand for transport of cars, which in today’s scope already significantly burdens the line in terms of permeability. (English)
23 October 2020
0 references
Identifiers
CZ.04.1.41/0.0/0.0/15_001/0000045
0 references