Reducing the energy performance of the school canteen and retinue in Protivín (Q72111): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Reducing the energy performance of the school canteen and retinue in Protivín

Revision as of 21:16, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reducing the energy performance of the school canteen and retinue in Protivín
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,518,434.32 Czech koruna
    0 references
    60,737.37 Euro
    10 January 2020
    0 references
    3,796,085.82 Czech koruna
    0 references
    151,843.43 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    16 September 2016
    0 references
    30 April 2018
    0 references
    Město Protivín
    0 references
    0 references
    0 references

    49°12'44.53"N, 14°12'39.78"E
    0 references
    39811
    0 references
    Záměrem projektu je zlepšení tepelně technických vlastností obvodových konstrukcí budovy školního pavilonu(ve vlastnictví města), která se nachází na parcele č. 60/5,60/11.Objekt byl vystaven v roce 1964 a rekonstruován v roce1981. V současné době je budova z energetického hlediska velmi nehospodárná (G) a vyžaduje potřebné stavební úpravy. Projekt navrhuje výměnu původních výplní otvorů, zateplení fasád, střešních konstrukcí stropů a svislé zateplení sklepního kamenného zdiva kamenného soklu. (Czech)
    0 references
    The aim of the project is to improve the thermally technical characteristics of the district buildings of the school pavilion (owned by the city), which is located on plot No. 60/5, 60/11.The building was exhibited in 1964 and reconstructed in 1981. The building is currently very uneconomical (G) from an energy point of view and requires the necessary construction modifications. The project proposes the replacement of the original opening fillings, the insulation of facades, roof structures of ceilings and vertical insulation of the cellar stone masonry of a stone plinth. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001594
    0 references