(Removed claim: summary (P836): The project aims at improving the thermal characteristics of the perimeter building of the school pavilion building (owned by the city), which is located on plot 60/11.Objekt 60/5, was issued in 1964 and reconstructed in 1981. The energy building is currently very wasteful (G) and requires the necessary construction work. The project proposes the replacement of original filling, insulation of facades, roof structures of the ceilings, and the v...) |
(Created claim: summary (P836): The aim of the project is to improve the thermally technical characteristics of the district buildings of the school pavilion (owned by the city), which is located on plot No. 60/5, 60/11.The building was exhibited in 1964 and reconstructed in 1981. The building is currently very uneconomical (G) from an energy point of view and requires the necessary construction modifications. The project proposes the replacement of the original opening fillin...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to improve the thermally technical characteristics of the district buildings of the school pavilion (owned by the city), which is located on plot No. 60/5, 60/11.The building was exhibited in 1964 and reconstructed in 1981. The building is currently very uneconomical (G) from an energy point of view and requires the necessary construction modifications. The project proposes the replacement of the original opening fillings, the insulation of facades, roof structures of ceilings and vertical insulation of the cellar stone masonry of a stone plinth. (English) | |||||||||||||||
Property / summary: The aim of the project is to improve the thermally technical characteristics of the district buildings of the school pavilion (owned by the city), which is located on plot No. 60/5, 60/11.The building was exhibited in 1964 and reconstructed in 1981. The building is currently very uneconomical (G) from an energy point of view and requires the necessary construction modifications. The project proposes the replacement of the original opening fillings, the insulation of facades, roof structures of ceilings and vertical insulation of the cellar stone masonry of a stone plinth. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to improve the thermally technical characteristics of the district buildings of the school pavilion (owned by the city), which is located on plot No. 60/5, 60/11.The building was exhibited in 1964 and reconstructed in 1981. The building is currently very uneconomical (G) from an energy point of view and requires the necessary construction modifications. The project proposes the replacement of the original opening fillings, the insulation of facades, roof structures of ceilings and vertical insulation of the cellar stone masonry of a stone plinth. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:16, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the energy performance of the school canteen and the anti-wine satellite |
Project in Czech Republic financed by DG Regio |
Statements
1,518,434.32 Czech koruna
0 references
3,796,085.82 Czech koruna
0 references
40.0 percent
0 references
16 September 2016
0 references
30 April 2018
0 references
Město Protivín
0 references
39811
0 references
Záměrem projektu je zlepšení tepelně technických vlastností obvodových konstrukcí budovy školního pavilonu(ve vlastnictví města), která se nachází na parcele č. 60/5,60/11.Objekt byl vystaven v roce 1964 a rekonstruován v roce1981. V současné době je budova z energetického hlediska velmi nehospodárná (G) a vyžaduje potřebné stavební úpravy. Projekt navrhuje výměnu původních výplní otvorů, zateplení fasád, střešních konstrukcí stropů a svislé zateplení sklepního kamenného zdiva kamenného soklu. (Czech)
0 references
The aim of the project is to improve the thermally technical characteristics of the district buildings of the school pavilion (owned by the city), which is located on plot No. 60/5, 60/11.The building was exhibited in 1964 and reconstructed in 1981. The building is currently very uneconomical (G) from an energy point of view and requires the necessary construction modifications. The project proposes the replacement of the original opening fillings, the insulation of facades, roof structures of ceilings and vertical insulation of the cellar stone masonry of a stone plinth. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/15_019/0001594
0 references