Reduction of the energy performance of the EDPB building in the municipality of Bleft (Q73499): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project addresses the reduction in energy intensity of the seat of the DPO. The project will lead to the insulation of the building envelope (roof, facade, windows) and to the replacement of the heating system, including the construction of new distribution systems, as well as the reconstruction of the electricity system with the exchange of lighting at an efficient LED material. The Left [605590] Parcela: ST. 30 n. 13 The project is not i...) |
(Created claim: summary (P836): The project solves the reduction of energy performance at the OÚ Blevice object. As part of the project, the building’s shell (roof, facade, windows) will be insulated and the heating system will be replaced, including the construction of new distribution systems and the reconstruction of the electrical system with the exchange of lighting for economical LED sources.Catastral area: Blevice [605590]Parcela: St. 30No.p. 13The project is not in VP...) |
||||||||||||||
Property / summary | |||||||||||||||
The project solves the reduction of energy performance at the OÚ Blevice object. As part of the project, the building’s shell (roof, facade, windows) will be insulated and the heating system will be replaced, including the construction of new distribution systems and the reconstruction of the electrical system with the exchange of lighting for economical LED sources.Catastral area: Blevice [605590]Parcela: St. 30No.p. 13The project is not in VP mode – The municipality has a population of 1.1.2017, 290 inhabitants (i.e. less than 1000) (English) | |||||||||||||||
Property / summary: The project solves the reduction of energy performance at the OÚ Blevice object. As part of the project, the building’s shell (roof, facade, windows) will be insulated and the heating system will be replaced, including the construction of new distribution systems and the reconstruction of the electrical system with the exchange of lighting for economical LED sources.Catastral area: Blevice [605590]Parcela: St. 30No.p. 13The project is not in VP mode – The municipality has a population of 1.1.2017, 290 inhabitants (i.e. less than 1000) (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project solves the reduction of energy performance at the OÚ Blevice object. As part of the project, the building’s shell (roof, facade, windows) will be insulated and the heating system will be replaced, including the construction of new distribution systems and the reconstruction of the electrical system with the exchange of lighting for economical LED sources.Catastral area: Blevice [605590]Parcela: St. 30No.p. 13The project is not in VP mode – The municipality has a population of 1.1.2017, 290 inhabitants (i.e. less than 1000) (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:13, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of the energy performance of the EDPB building in the municipality of Bleft |
Project in Czech Republic financed by DG Regio |
Statements
533,566.4 Czech koruna
0 references
1,333,916.0 Czech koruna
0 references
40 percent
0 references
6 February 2019
0 references
31 December 2019
0 references
Obec Blevice
0 references
27328
0 references
Projekt řeší snížení energetické náročnosti u objektu OÚ Blevice. V rámci projektu dojde k zateplení pláště budovy (střecha, fasáda,okna) a dále k výměně systému vytápění vč. vybudování nových rozvodů a dále rekonstrukce elektrosoustavy s výměnou osvětlení za úsporné LED zdroje.Katastrální území: Blevice [605590]Parcela: st. 30č.p. 13Projekt není v režimu VP - Obec má k 1.1.2017, 290 obyvatel (tedy méně než 1000) (Czech)
0 references
The project solves the reduction of energy performance at the OÚ Blevice object. As part of the project, the building’s shell (roof, facade, windows) will be insulated and the heating system will be replaced, including the construction of new distribution systems and the reconstruction of the electrical system with the exchange of lighting for economical LED sources.Catastral area: Blevice [605590]Parcela: St. 30No.p. 13The project is not in VP mode – The municipality has a population of 1.1.2017, 290 inhabitants (i.e. less than 1000) (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/17_070/0006691
0 references