Energy savings for track “C” (Q73117): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project focuses on the insulation of the track building C on the B campus. The objective of the project is to ensure a reduction in the energy performance of the building by means of an overall energy saving renovation of the building structure of the C building, which consists of the overall insulation of the building. The project is linked to the activities of the building component — insulation and activities of administrative work, PD,...) |
(Created claim: summary (P836): The project is focused on insulation of the building of C dormitories in the area of VŠB – TUO. The aim of the project is to reduce the energy performance of the building by means of the overall energy-saving renovation of the C building building consisting of the total insulation of this building. The project is connected with the activities of the construction part – insulation and also administrative activities, processing of PD, EP, submissi...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is focused on insulation of the building of C dormitories in the area of VŠB – TUO. The aim of the project is to reduce the energy performance of the building by means of the overall energy-saving renovation of the C building building consisting of the total insulation of this building. The project is connected with the activities of the construction part – insulation and also administrative activities, processing of PD, EP, submission of applications for subsidies, TDI, OSH, AD, managerial management and processing of tenders for contractors of construction works. (English) | |||||||||||||||
Property / summary: The project is focused on insulation of the building of C dormitories in the area of VŠB – TUO. The aim of the project is to reduce the energy performance of the building by means of the overall energy-saving renovation of the C building building consisting of the total insulation of this building. The project is connected with the activities of the construction part – insulation and also administrative activities, processing of PD, EP, submission of applications for subsidies, TDI, OSH, AD, managerial management and processing of tenders for contractors of construction works. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is focused on insulation of the building of C dormitories in the area of VŠB – TUO. The aim of the project is to reduce the energy performance of the building by means of the overall energy-saving renovation of the C building building consisting of the total insulation of this building. The project is connected with the activities of the construction part – insulation and also administrative activities, processing of PD, EP, submission of applications for subsidies, TDI, OSH, AD, managerial management and processing of tenders for contractors of construction works. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:08, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy savings for track “C” |
Project in Czech Republic financed by DG Regio |
Statements
4,888,791.6 Czech koruna
0 references
13,967,976.0 Czech koruna
0 references
35 percent
0 references
4 April 2018
0 references
31 March 2020
0 references
Vysoká škola báňská - Technická univerzita Ostrava
0 references
70800
0 references
Projekt je zaměřen na zateplení objektu kolejí C v areálu VŠB - TUO. Cílem projektu je zajištění snížení energetické náročnosti budovy pomocí celkové energeticky úsporné renovace objektu budovy kolejí C spočívající v celkovém zateplení tohoto objektu. Projekt je spojen s aktivitami stavební části - zateplení a také s aktivitami administrativními, zpracování PD, EP, podáním žádosti o dotaci, TDI, BOZP, AD, manažerským řízením a zpracováním výběrového řízení na dodavatele stavebních prací. (Czech)
0 references
The project is focused on insulation of the building of C dormitories in the area of VŠB – TUO. The aim of the project is to reduce the energy performance of the building by means of the overall energy-saving renovation of the C building building consisting of the total insulation of this building. The project is connected with the activities of the construction part – insulation and also administrative activities, processing of PD, EP, submission of applications for subsidies, TDI, OSH, AD, managerial management and processing of tenders for contractors of construction works. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/17_070/0005857
0 references