Improvement of the energy performance of the public building in ul. 17 November No 861 (Q72876): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project involves the implementation of complex technical measures to reduce the energy performance of the public building in ul. On 17 November 861, Mr Jičín. The measures consist of insulation of the envelope of the building, including partial refurbishment of the envelope, filling the holes (windows and doors) and insulation of the roof of a multi-storey building. The implementation of the project will benefit the reduction of energy con...) |
(Created claim: summary (P836): The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of the public building in ul. November 17, 861 Jicin. The measures consist of the insulated cover of the building, including the partial reconstruction of its casing, the replacement of the opening fillings (windows and doors) and the insulation of the roof of the multi-storey building. The project will benefit from reducing...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of the public building in ul. November 17, 861 Jicin. The measures consist of the insulated cover of the building, including the partial reconstruction of its casing, the replacement of the opening fillings (windows and doors) and the insulation of the roof of the multi-storey building. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English) | |||||||||||||||
Property / summary: The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of the public building in ul. November 17, 861 Jicin. The measures consist of the insulated cover of the building, including the partial reconstruction of its casing, the replacement of the opening fillings (windows and doors) and the insulation of the roof of the multi-storey building. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of the public building in ul. November 17, 861 Jicin. The measures consist of the insulated cover of the building, including the partial reconstruction of its casing, the replacement of the opening fillings (windows and doors) and the insulation of the roof of the multi-storey building. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:00, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the energy performance of the public building in ul. 17 November No 861 |
Project in Czech Republic financed by DG Regio |
Statements
4,200,340.8 Czech koruna
0 references
10,500,852.0 Czech koruna
0 references
40 percent
0 references
7 November 2018
0 references
31 December 2021
0 references
Město Jičín
0 references
50601
0 references
Předmětem projektu je provedení komplexních stavebně technických opatření s cílem snížení energetické náročnosti veřejné budovy v ul. 17. listopadu č.p. 861 Jičín. Opatření spočívají v provedení zateplení obálky budovy, vč. částečné rekonstrukce jejího pláště, dále ve výměně výplní otvorů (oken i dveří) a zateplení střechy vícepodlažní budovy. Přínosem realizace projektu bude snížení spotřeby energií a s tím související snížení emisí znečišťujících látek. (Czech)
0 references
The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of the public building in ul. November 17, 861 Jicin. The measures consist of the insulated cover of the building, including the partial reconstruction of its casing, the replacement of the opening fillings (windows and doors) and the insulation of the roof of the multi-storey building. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/16_039/0004323
0 references