Improvement of the energy performance of the public building in ul. 17 November No 861 (Q72876): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project involves the implementation of complex technical measures to reduce the energy performance of the public building in ul. On 17 November 861, Mr Jičín. The measures consist of insulation of the envelope of the building, including partial refurbishment of the envelope, filling the holes (windows and doors) and insulation of the roof of a multi-storey building. The implementation of the project will benefit the reduction of energy con...)
Property / summary
The project involves the implementation of complex technical measures to reduce the energy performance of the public building in ul. On 17 November 861, Mr Jičín. The measures consist of insulation of the envelope of the building, including partial refurbishment of the envelope, filling the holes (windows and doors) and insulation of the roof of a multi-storey building. The implementation of the project will benefit the reduction of energy consumption and the related reduction of pollutant emissions. (English)
 
Property / summary: The project involves the implementation of complex technical measures to reduce the energy performance of the public building in ul. On 17 November 861, Mr Jičín. The measures consist of insulation of the envelope of the building, including partial refurbishment of the envelope, filling the holes (windows and doors) and insulation of the roof of a multi-storey building. The implementation of the project will benefit the reduction of energy consumption and the related reduction of pollutant emissions. (English) / rank
Normal rank
 

Revision as of 21:00, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Improvement of the energy performance of the public building in ul. 17 November No 861
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,200,340.8 Czech koruna
    0 references
    168,013.63 Euro
    10 January 2020
    0 references
    10,500,852.0 Czech koruna
    0 references
    420,034.08 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    7 November 2018
    0 references
    31 December 2021
    0 references
    Město Jičín
    0 references
    0 references
    0 references

    50°26'15.14"N, 15°19'55.52"E
    0 references
    50601
    0 references
    Předmětem projektu je provedení komplexních stavebně technických opatření s cílem snížení energetické náročnosti veřejné budovy v ul. 17. listopadu č.p. 861 Jičín. Opatření spočívají v provedení zateplení obálky budovy, vč. částečné rekonstrukce jejího pláště, dále ve výměně výplní otvorů (oken i dveří) a zateplení střechy vícepodlažní budovy. Přínosem realizace projektu bude snížení spotřeby energií a s tím související snížení emisí znečišťujících látek. (Czech)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/16_039/0004323
    0 references