Reduction of energy intensity of object No p. 59, Lom (Q72054): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The insulation of the building envelope, the floor on the ground and the ceiling, will be completed. A heat pump shall also be installed. The building is based on p..55, Č.p. 59 Lom, remove_old_english_translation)
(‎Created claim: summary (P836): Insulation of the building’s outer shell, ground floor and ceiling will be implemented. In addition, a heat pump will be installed. The building is located at p. no. st. 55, No.59 Lom, translated_summary)
Property / summary
 
Insulation of the building’s outer shell, ground floor and ceiling will be implemented. In addition, a heat pump will be installed. The building is located at p. no. st. 55, No.59 Lom (English)
Property / summary: Insulation of the building’s outer shell, ground floor and ceiling will be implemented. In addition, a heat pump will be installed. The building is located at p. no. st. 55, No.59 Lom (English) / rank
 
Normal rank
Property / summary: Insulation of the building’s outer shell, ground floor and ceiling will be implemented. In addition, a heat pump will be installed. The building is located at p. no. st. 55, No.59 Lom (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:58, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy intensity of object No p. 59, Lom
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    446,495.2 Czech koruna
    0 references
    17,859.81 Euro
    10 January 2020
    0 references
    1,116,238.0 Czech koruna
    0 references
    44,649.52 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    1 September 2017
    0 references
    31 December 2017
    0 references
    Obec Lom
    0 references
    0 references
    0 references

    49°24'10.48"N, 14°40'45.52"E
    0 references
    39002
    0 references
    Bude realizováno zateplení obvodového pláště budovy, podlahy na terénu a stropu. Dále bude instalováno tepelné čerpadlo. Budova se nachází na p.č. st. 55, č.p.59 Lom (Czech)
    0 references
    Insulation of the building’s outer shell, ground floor and ceiling will be implemented. In addition, a heat pump will be installed. The building is located at p. no. st. 55, No.59 Lom (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001555
    0 references