Q71936 (Q71936): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project includes thermal insulation of the Kindergarten building in Černá Dole No.76 on plot 99, k.ú. The goal is energy saving of final consumption thanks to the more favourable casing of the building, reduction of CO2 emissions during heating and education in the area of energy saving through practical demonstration of savings.Insulated insulation of cooled circuit walls, roofs, ceiling to soil and ceiling above 1thPP and replacement of fi...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 20:56, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
932,199.29 Czech koruna
0 references
2,330,498.24 Czech koruna
0 references
40.0 percent
0 references
12 June 2017
0 references
28 November 2018
0 references
30 November 2018
0 references
Městys Černý Důl
0 references
54344
0 references
Obsahem projektu je zateplení budovy Mateřské školy v Černém Dole č.p.76 na pozemku st. 99, k.ú. Čistá v Krkonoších.Cílem jsou energetické úspory konečné spotřeby díky výhodnějšímu plášti objektu, snížení emisí CO2 při vytápění a osvěta v oblasti šetření energií formou praktické ukázky úspor.Bude provedeno zateplení ochlazovaných obvodových stěn, střech, stropu do půdy a stropu nad 1.PP a výměna výplní otvorů.Předpokladem je získání dotace a úspěšná realizace výběrového řízení na zhotovitele. (Czech)
0 references
The project includes thermal insulation of the Kindergarten building in Černá Dole No.76 on plot 99, k.ú. The goal is energy saving of final consumption thanks to the more favourable casing of the building, reduction of CO2 emissions during heating and education in the area of energy saving through practical demonstration of savings.Insulated insulation of cooled circuit walls, roofs, ceiling to soil and ceiling above 1thPP and replacement of filling openings will be done. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/15_019/0001499
0 references