Insulation of the building of the kindergarten, Black mine (Q71936): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project content is the insulation of the building of the Home School in the Black Dole C.p. 76 on the plot st. 99, the cadastral district of the cadastral district. The net in Krkonošch.The objective is the energy savings of final consumption due to the more advantageous design of the building, the reduction of CO2 emissions in heating and the provision of education in the field of energy saving by way of practical demonstration of the eco...)
Property / summary
The project content is the insulation of the building of the Home School in the Black Dole C.p. 76 on the plot st. 99, the cadastral district of the cadastral district. The net in Krkonošch.The objective is the energy savings of final consumption due to the more advantageous design of the building, the reduction of CO2 emissions in heating and the provision of education in the field of energy saving by way of practical demonstration of the economy. the insulation of the cooled wall walls, roofs, the ceiling of land and the ceiling above 1.PP and the replacement of the fillers will be carried out. (English)
 
Property / summary: The project content is the insulation of the building of the Home School in the Black Dole C.p. 76 on the plot st. 99, the cadastral district of the cadastral district. The net in Krkonošch.The objective is the energy savings of final consumption due to the more advantageous design of the building, the reduction of CO2 emissions in heating and the provision of education in the field of energy saving by way of practical demonstration of the economy. the insulation of the cooled wall walls, roofs, the ceiling of land and the ceiling above 1.PP and the replacement of the fillers will be carried out. (English) / rank
Normal rank
 

Revision as of 20:56, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Insulation of the building of the kindergarten, Black mine
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    932,199.29 Czech koruna
    0 references
    37,287.97 Euro
    10 January 2020
    0 references
    2,330,498.24 Czech koruna
    0 references
    93,219.93 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    12 June 2017
    0 references
    28 November 2018
    0 references
    30 November 2018
    0 references
    Městys Černý Důl
    0 references
    0 references
    0 references

    50°37'44.94"N, 15°42'37.19"E
    0 references
    54344
    0 references
    Obsahem projektu je zateplení budovy Mateřské školy v Černém Dole č.p.76 na pozemku st. 99, k.ú. Čistá v Krkonoších.Cílem jsou energetické úspory konečné spotřeby díky výhodnějšímu plášti objektu, snížení emisí CO2 při vytápění a osvěta v oblasti šetření energií formou praktické ukázky úspor.Bude provedeno zateplení ochlazovaných obvodových stěn, střech, stropu do půdy a stropu nad 1.PP a výměna výplní otvorů.Předpokladem je získání dotace a úspěšná realizace výběrového řízení na zhotovitele. (Czech)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001499
    0 references