VSETÍN PRIMARY SCHOOL, ROKYTNICE 436 — ENERGY PERFORMANCE REDUCTION (Q72983): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The purpose of the project is building modification of the current building Primary School, Vsetín, Rokytnice 436. The main objective of the construction work is to ensure the improvement of the energy performance of the site of the nursery. The project shall address the complete insulation of the building envelope, including the roofs, the replacement of the openings in the circumferential casing, the replacement of the original wooden window...)
Property / summary
The purpose of the project is building modification of the current building Primary School, Vsetín, Rokytnice 436. The main objective of the construction work is to ensure the improvement of the energy performance of the site of the nursery. The project shall address the complete insulation of the building envelope, including the roofs, the replacement of the openings in the circumferential casing, the replacement of the original wooden windows, the doors of the doors, the interior metal door of the main inputs, the glass walls in stairs with leadership, changing rooms and gyms, a system of forced ventilation, including lightning conductors. (English)
 
Property / summary: The purpose of the project is building modification of the current building Primary School, Vsetín, Rokytnice 436. The main objective of the construction work is to ensure the improvement of the energy performance of the site of the nursery. The project shall address the complete insulation of the building envelope, including the roofs, the replacement of the openings in the circumferential casing, the replacement of the original wooden windows, the doors of the doors, the interior metal door of the main inputs, the glass walls in stairs with leadership, changing rooms and gyms, a system of forced ventilation, including lightning conductors. (English) / rank
Normal rank
 

Revision as of 20:53, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
VSETÍN PRIMARY SCHOOL, ROKYTNICE 436 — ENERGY PERFORMANCE REDUCTION
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    11,872,458.4 Czech koruna
    0 references
    474,898.34 Euro
    10 January 2020
    0 references
    29,681,146.0 Czech koruna
    0 references
    1,187,245.84 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    1 June 2018
    0 references
    31 December 2018
    0 references
    Město Vsetín
    0 references
    0 references
    0 references

    49°20'4.70"N, 17°59'38.00"E
    0 references
    75501
    0 references
    Předmětem projektu jsou stavební úpravy stávajícího objektu Základní školy Vsetín, Rokytnice 436. Hlavním cílem stavebních úprav je zajištění snížení energetické náročnosti objektu ZŠ. Projekt řeší kompletní zateplení obvodového pláště objektu včetně střech, výměnu výplní otvorů v obvodovém plášti, výměnu původních dřevěných oken, kovových dveří, vnitřních kovových dveří u hlavních vstupů, prosklených stěn na schodištích pav. vedení, šaten a tělocvičen, systém nuceného větrání včetně hromosvodu. (Czech)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/16_039/0004465
    0 references