INSULATION OF THE BUILDING ENVELOPE SOKOLNY (Q72939): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at reducing the energy performance of the sonar building and reducing the operating costs. The project shall address the insulation of the building envelope of the certified building system. In addition, the replacement of non-compliant wooden windows and doors in the case of plastic with insulation double glass will be carried out. The project will include the insulation of soil and the insulation of floors in social faciliti...) |
(Created claim: summary (P836): The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In o...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In order to achieve this, there will be the introduction of an energy mammoth. (English) | |||||||||||||||
Property / summary: The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In order to achieve this, there will be the introduction of an energy mammoth. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In order to achieve this, there will be the introduction of an energy mammoth. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 20:50, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | INSULATION OF THE BUILDING ENVELOPE SOKOLNY |
Project in Czech Republic financed by DG Regio |
Statements
883,009.62 Czech koruna
0 references
2,207,524.06 Czech koruna
0 references
40.0 percent
0 references
3 November 2017
0 references
31 January 2020
0 references
Obec Lesonice
0 references
67544
0 references
Záměrem projektu je snížení energetické náročnosti budovy sokolovny a snížení provozních nákladů. Projekt řeší zateplení obvodového pláště budovy certifikovaným kontaktním zateplovacím systémem. Dále bude provedena výměna nevyhovujících dřevěných oken a dveří za plastové s izolačním dvojsklem. V rámci projektu bude provedeno zateplení půdy a zateplení podlah v sociálním zařízení. K dosažení tohoto záměru bude zavedení energetického mamagemtu. (Czech)
0 references
The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In order to achieve this, there will be the introduction of an energy mammoth. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/16_039/0004408
0 references