INSULATION OF THE BUILDING ENVELOPE OF THE MUNICIPAL OFFICE (Q72931): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at reducing the energy performance of the municipality’s building and reducing operating costs. The project shall address the insulation of the building envelope of the certified building system. In addition, the replacement of non-compliant wooden windows and doors in the case of plastic with insulation double glass will be carried out. The project will also cover the insulation of the soil with mineral tolerance. To achieve...) |
(Created claim: summary (P836): The aim of the project is to reduce the energy performance of the municipal office building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. The project will also include mineral wool insulation of soil. In order to achieve this, there will be...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to reduce the energy performance of the municipal office building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. The project will also include mineral wool insulation of soil. In order to achieve this, there will be an energy manager. (English) | |||||||||||||||
Property / summary: The aim of the project is to reduce the energy performance of the municipal office building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. The project will also include mineral wool insulation of soil. In order to achieve this, there will be an energy manager. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to reduce the energy performance of the municipal office building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. The project will also include mineral wool insulation of soil. In order to achieve this, there will be an energy manager. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 20:50, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | INSULATION OF THE BUILDING ENVELOPE OF THE MUNICIPAL OFFICE |
Project in Czech Republic financed by DG Regio |
Statements
522,283.22 Czech koruna
0 references
1,305,708.07 Czech koruna
0 references
40.0 percent
0 references
25 October 2017
0 references
31 October 2019
0 references
Obec Lesonice
0 references
67544
0 references
Záměrem projektu je snížení energetické náročnosti budovy obecní úřadu a snížení provozních nákladů. Projekt řeší zateplení obvodového pláště budovy certifikovaným kontaktním zateplovacím systémem. Dále bude provedena výměna nevyhovujících dřevěných oken a dveří za plastové s izolačním dvojsklem. V rámci projektu bude provedeno i zateplení půdy minerální vatou. K dosažení tohoto záměru bude zavedení energetického managemtu. (Czech)
0 references
The aim of the project is to reduce the energy performance of the municipal office building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. The project will also include mineral wool insulation of soil. In order to achieve this, there will be an energy manager. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/16_039/0004399
0 references