Insulation 63. MŠ K. Steinera 25, Pilsen (Q72896): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The subject of the project is the implementation of energy-saving measures designed to improve the thermal performance of the building envelope, coupled with compliance with the hygiene and operational ventilation requirements, i.e. the installation of ventilation systems for recuperative ventilation. The project will be implemented by K. Steinera 63, Plzeň, on plots of land Nos 2176/134, 2176/135, 2176/136, 2176/137 and 2176/191., remove_old_...) |
(Created claim: summary (P836): The aim of the project is to implement energy-saving measures aimed at improving the thermal-technical properties of the building envelope together with compliance with hygienic and operational requirements for ventilation, i.e. the installation of air conditioning equipment for recuperative ventilation. The project will be realised at K. Steinera 63, Plzeň, on land p. 2176/134, 2176/135, 2176/136, 2176/137 and 2176/191., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to implement energy-saving measures aimed at improving the thermal-technical properties of the building envelope together with compliance with hygienic and operational requirements for ventilation, i.e. the installation of air conditioning equipment for recuperative ventilation. The project will be realised at K. Steinera 63, Plzeň, on land p. 2176/134, 2176/135, 2176/136, 2176/137 and 2176/191. (English) | |||||||||||||||
Property / summary: The aim of the project is to implement energy-saving measures aimed at improving the thermal-technical properties of the building envelope together with compliance with hygienic and operational requirements for ventilation, i.e. the installation of air conditioning equipment for recuperative ventilation. The project will be realised at K. Steinera 63, Plzeň, on land p. 2176/134, 2176/135, 2176/136, 2176/137 and 2176/191. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to implement energy-saving measures aimed at improving the thermal-technical properties of the building envelope together with compliance with hygienic and operational requirements for ventilation, i.e. the installation of air conditioning equipment for recuperative ventilation. The project will be realised at K. Steinera 63, Plzeň, on land p. 2176/134, 2176/135, 2176/136, 2176/137 and 2176/191. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 20:49, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Insulation 63. MŠ K. Steinera 25, Pilsen |
Project in Czech Republic financed by DG Regio |
Statements
3,800,538.94 Czech koruna
0 references
9,501,347.35 Czech koruna
0 references
40 percent
0 references
1 June 2018
0 references
29 February 2020
0 references
Statutární město Plzeň
0 references
30100
0 references
Předmětem projektu je realizace energeticky úsporných opatření směřujících ke zlepšení tepelně-technických vlastností obálky budov spolu s dodržením hygienických a provozních požadavků na větrání, tj. zabudování zařízení vzduchotechniky pro rekuperační větrání. Projekt bude realizován na adrese K. Steinera 63, Plzeň, na pozemcích p. č. 2176/134, 2176/135, 2176/136, 2176/137 a 2176/191. (Czech)
0 references
The aim of the project is to implement energy-saving measures aimed at improving the thermal-technical properties of the building envelope together with compliance with hygienic and operational requirements for ventilation, i.e. the installation of air conditioning equipment for recuperative ventilation. The project will be realised at K. Steinera 63, Plzeň, on land p. 2176/134, 2176/135, 2176/136, 2176/137 and 2176/191. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/16_039/0004350
0 references