Improvement in the energy performance of the Central Industrial School of St. Anežka České, Český Krumlo_1 (Q73052): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The Series No 109 is composed of a number of buildings — A to No 326/1, a building of the Nursery School in No 326/4, and Building B on p.m. No 1353. Czech Krumlov. The A building is an immovable cultural monument which is registered under the terms of No 11904/3-6052. It is not a cellar of four storeys with a SS and a single-deck house of a kindergarten. The Building B is a single, single-deck object with a soil installation in the middle par...)
Property / summary
The Series No 109 is composed of a number of buildings — A to No 326/1, a building of the Nursery School in No 326/4, and Building B on p.m. No 1353. Czech Krumlov. The A building is an immovable cultural monument which is registered under the terms of No 11904/3-6052. It is not a cellar of four storeys with a SS and a single-deck house of a kindergarten. The Building B is a single, single-deck object with a soil installation in the middle part. Windows exchange and hot roof insulation are proposed to reduce energy intensity. (English)
 
Property / summary: The Series No 109 is composed of a number of buildings — A to No 326/1, a building of the Nursery School in No 326/4, and Building B on p.m. No 1353. Czech Krumlov. The A building is an immovable cultural monument which is registered under the terms of No 11904/3-6052. It is not a cellar of four storeys with a SS and a single-deck house of a kindergarten. The Building B is a single, single-deck object with a soil installation in the middle part. Windows exchange and hot roof insulation are proposed to reduce energy intensity. (English) / rank
Normal rank
 

Revision as of 20:46, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Improvement in the energy performance of the Central Industrial School of St. Anežka České, Český Krumlo_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,667,392.8 Czech koruna
    0 references
    146,695.71 Euro
    10 January 2020
    0 references
    9,168,482.0 Czech koruna
    0 references
    366,739.28 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    24 June 2019
    0 references
    30 October 2018
    0 references
    Střední uměleckoprůmyslová škola sv. Anežky České, Český Krumlov, Tavírna 109
    0 references
    0 references

    48°49'28.16"N, 14°19'57.79"E
    0 references

    48°48'24.30"N, 14°18'41.76"E
    0 references
    38101
    0 references
    Areál SUPŠ č.p. 109 je složen z několika objektů - budovy A na p.č. 326/1, budovy školníka na p.č. 326/4 a budovy B na p.č. 1353 vše k.ú. Český Krumlov. Budova A je nemovitou kulturní památkou zapsanou pod č. 11904/3-6052. Je to nepodsklepená čtyřpodlažní budova s učebnami SUPŠ spojená terasou s jednopodlažním domem školníka. Budova B je samostatně stojící jednopodlažní objekt s půdní vestavbou v prostřední části. Pro snížení energetické náročnosti je navržena výměna oken a zateplení střech. (Czech)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/17_070/0005202
    0 references