Optimisation of the energy performance of the EDPB (Q73018): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will lead to the insulation of the municipal office in the municipality of No 112, p. 175. Pupils (794295). The window and door filling shall be exchanged, the insulation of the envelope of the building and the replacement of the heat source, the installation of the air-to-water heat pump. From the point of view of compliance with hygiene standards for children and adolescents, the installation of a complete ventilation unit into t...)
(‎Created claim: summary (P836): As part of the project, the municipal office building in Žáky no. 112, p. no. 175, k. ú. will be insulated. Pupils (794295). There will be exchanges of window and door panels, to insulate the building envelope and to replace the heating source, an air-water heat pump will be installed. In terms of compliance with hygiene standards for children and adolescents, a compact ventilation unit will also be installed in the classes of kindergarten, whic...)
Property / summary
 
As part of the project, the municipal office building in Žáky no. 112, p. no. 175, k. ú. will be insulated. Pupils (794295). There will be exchanges of window and door panels, to insulate the building envelope and to replace the heating source, an air-water heat pump will be installed. In terms of compliance with hygiene standards for children and adolescents, a compact ventilation unit will also be installed in the classes of kindergarten, which will be created after the overall reconstruction of the office building. (English)
Property / summary: As part of the project, the municipal office building in Žáky no. 112, p. no. 175, k. ú. will be insulated. Pupils (794295). There will be exchanges of window and door panels, to insulate the building envelope and to replace the heating source, an air-water heat pump will be installed. In terms of compliance with hygiene standards for children and adolescents, a compact ventilation unit will also be installed in the classes of kindergarten, which will be created after the overall reconstruction of the office building. (English) / rank
 
Normal rank
Property / summary: As part of the project, the municipal office building in Žáky no. 112, p. no. 175, k. ú. will be insulated. Pupils (794295). There will be exchanges of window and door panels, to insulate the building envelope and to replace the heating source, an air-water heat pump will be installed. In terms of compliance with hygiene standards for children and adolescents, a compact ventilation unit will also be installed in the classes of kindergarten, which will be created after the overall reconstruction of the office building. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:45, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Optimisation of the energy performance of the EDPB
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,091,686.4 Czech koruna
    0 references
    43,667.46 Euro
    10 January 2020
    0 references
    2,729,216.0 Czech koruna
    0 references
    109,168.64 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    6 February 2017
    0 references
    31 December 2018
    0 references
    Obec Žáky
    0 references
    0 references
    0 references

    49°53'18.89"N, 15°23'7.22"E
    0 references
    28601
    0 references
    V rámci projektu dojde k zateplení budovy obecního úřadu v obci Žáky č. p. 112, p. č. 175, k. ú. Žáky (794295). Dojde k výměně okenních a dveřních výplní, k zateplení obálky budovy a výměně zdroje vytápění, bude nainstalováno tepelné čerpadlo vzduch-voda. Z hlediska dodržení hygienických norem pro děti a mladistvé, dojde též k instalaci kompaktní větrací jednotky do tříd MŠ, které po celkové rekonstrukci budovy úřadu vzniknou. (Czech)
    0 references
    As part of the project, the municipal office building in Žáky no. 112, p. no. 175, k. ú. will be insulated. Pupils (794295). There will be exchanges of window and door panels, to insulate the building envelope and to replace the heating source, an air-water heat pump will be installed. In terms of compliance with hygiene standards for children and adolescents, a compact ventilation unit will also be installed in the classes of kindergarten, which will be created after the overall reconstruction of the office building. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/16_039/0004505
    0 references