Insulation of a multi-purpose building in Malovice (Q72755): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is to improve the thermal characteristics of the peripheral structures of the Malovice No 5 building, where the municipal office, the fire armer and 12 municipal apartments are located (of which 11 are social). the following works will be carried out in accordance with the current energy assessment: the insulation of the building envelope, including the blurring of the islant tl. Of 160 mm of polystyrene (for more de...) |
(Created claim: summary (P836): The object of the project is to improve the thermally technical characteristics of the circumferential structures of the multipurpose building in Malovice no. 5, which houses the seat of the municipal office, fire brigade and 12 municipal flats (of which 11 are social).In accordance with the current energy assessment, the following construction works will be carried out:1. 160 mm of polystyrene (see for more details. PD + EP)2. roof insulation b...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is to improve the thermally technical characteristics of the circumferential structures of the multipurpose building in Malovice no. 5, which houses the seat of the municipal office, fire brigade and 12 municipal flats (of which 11 are social).In accordance with the current energy assessment, the following construction works will be carried out:1. 160 mm of polystyrene (see for more details. PD + EP)2. roof insulation by insulator tl. 300 mm of mineral wool. (English) | |||||||||||||||
Property / summary: The object of the project is to improve the thermally technical characteristics of the circumferential structures of the multipurpose building in Malovice no. 5, which houses the seat of the municipal office, fire brigade and 12 municipal flats (of which 11 are social).In accordance with the current energy assessment, the following construction works will be carried out:1. 160 mm of polystyrene (see for more details. PD + EP)2. roof insulation by insulator tl. 300 mm of mineral wool. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is to improve the thermally technical characteristics of the circumferential structures of the multipurpose building in Malovice no. 5, which houses the seat of the municipal office, fire brigade and 12 municipal flats (of which 11 are social).In accordance with the current energy assessment, the following construction works will be carried out:1. 160 mm of polystyrene (see for more details. PD + EP)2. roof insulation by insulator tl. 300 mm of mineral wool. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 20:41, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Insulation of a multi-purpose building in Malovice |
Project in Czech Republic financed by DG Regio |
Statements
705,349.65 Czech koruna
0 references
1,763,374.13 Czech koruna
0 references
40.0 percent
0 references
1 April 2017
0 references
29 March 2019
0 references
31 March 2019
0 references
Obec Malovice
0 references
38411
0 references
Předmětem projektu je zlepšení tepelně technických vlastností obvodových konstrukcí víceúčelové budovy v Malovicích č.p. 5, ve které se nalézá sídlo obecního úřadu, hasičská zbrojnice a 12 obecních bytů (z toho 11 je sociálních).V souladu s aktuálním energetickým posudkem budou provedeny následující stavební práce:1. zateplení obvodového pláště budovy vč. ostění izolantem tl. 160 mm z polystyrenu (blíže viz. PD + EP)2. zateplení střechy izolantem tl. 300 mm z minerální vlny. (Czech)
0 references
The object of the project is to improve the thermally technical characteristics of the circumferential structures of the multipurpose building in Malovice no. 5, which houses the seat of the municipal office, fire brigade and 12 municipal flats (of which 11 are social).In accordance with the current energy assessment, the following construction works will be carried out:1. 160 mm of polystyrene (see for more details. PD + EP)2. roof insulation by insulator tl. 300 mm of mineral wool. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/16_039/0004162
0 references