(‎Removed claim: summary (P836): The insulation of the building envelope, the floor of the soil, the roof of the social equipment, the roofs of the interior of the land and the exchange of the door at the premises No p. 38 in the Bezděkov, p.m, will be carried out: 15. In addition, a forced ventilation system will be installed with recovery, a heating system and energy management will be introduced., remove_old_english_translation)
(‎Created claim: summary (P836): Insulation of the building’s outer shell, flooring, roofs of social facilities, roofs of ground floor extension and replacement of doors in the building No. 38 in Bezděkov, p.č.st. will be implemented: 15. In addition, forced ventilation with recuperation will be installed, the heating system will be regulated and energy management will be introduced., translated_summary)
Property / summary
 
Insulation of the building’s outer shell, flooring, roofs of social facilities, roofs of ground floor extension and replacement of doors in the building No. 38 in Bezděkov, p.č.st. will be implemented: 15. In addition, forced ventilation with recuperation will be installed, the heating system will be regulated and energy management will be introduced. (English)
Property / summary: Insulation of the building’s outer shell, flooring, roofs of social facilities, roofs of ground floor extension and replacement of doors in the building No. 38 in Bezděkov, p.č.st. will be implemented: 15. In addition, forced ventilation with recuperation will be installed, the heating system will be regulated and energy management will be introduced. (English) / rank
 
Normal rank
Property / summary: Insulation of the building’s outer shell, flooring, roofs of social facilities, roofs of ground floor extension and replacement of doors in the building No. 38 in Bezděkov, p.č.st. will be implemented: 15. In addition, forced ventilation with recuperation will be installed, the heating system will be regulated and energy management will be introduced. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:10, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Insulation and replacement of heat generator in Bezděkov Primary School
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,295,965.58 Czech koruna
    0 references
    51,838.62 Euro
    10 January 2020
    0 references
    3,239,913.96 Czech koruna
    0 references
    129,596.56 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    18 July 2017
    0 references
    31 May 2020
    0 references
    Obec Bezděkov
    0 references
    0 references
    0 references

    49°23'21.98"N, 13°17'52.30"E
    0 references
    33901
    0 references
    Bude realizováno zateplení obvodového pláště budovy, podlahy půdy, střechy sociálních zařízení, střechy přízemních přístaveb a výměna dveří v objektu č.p. 38 v Bezděkově, p.č.st.: 15. Dále bude instalováno nucené větrání s rekuperací, bude vyregulována otopná soustava a zaveden energetický management. (Czech)
    0 references
    Insulation of the building’s outer shell, flooring, roofs of social facilities, roofs of ground floor extension and replacement of doors in the building No. 38 in Bezděkov, p.č.st. will be implemented: 15. In addition, forced ventilation with recuperation will be installed, the heating system will be regulated and energy management will be introduced. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001994
    0 references