Energy recovery installations (Q65669): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the project is the construction of an energy recovery facility based on the bio-gas station principle associated with the production capacity of the applicant. Karel HORÁKA in Chošovice. The project involves the construction of specialised bio-waste tanks and other substrate, the technology for ensuring the function of the biogas plant, as well as the treatment of biogas plants and its collection for further use. The plant proce...)
(‎Created claim: summary (P836): The object of the project is the construction of a plant for energy use of waste based on the principle of a biogas station associated with the production capacity of the applicant Ing. Karl Horák in Choťovice. The project includes the construction of a specialised digestion tank for bio-waste and other substrate, technology to ensure the function of the biogas station, as well as equipment for cleaning and collecting biogas for further use. The...)
Property / summary
 
The object of the project is the construction of a plant for energy use of waste based on the principle of a biogas station associated with the production capacity of the applicant Ing. Karl Horák in Choťovice. The project includes the construction of a specialised digestion tank for bio-waste and other substrate, technology to ensure the function of the biogas station, as well as equipment for cleaning and collecting biogas for further use. The plant will process approximately 1450 tonnes of waste annually, with the waste accounting for 90 % of the material used. (English)
Property / summary: The object of the project is the construction of a plant for energy use of waste based on the principle of a biogas station associated with the production capacity of the applicant Ing. Karl Horák in Choťovice. The project includes the construction of a specialised digestion tank for bio-waste and other substrate, technology to ensure the function of the biogas station, as well as equipment for cleaning and collecting biogas for further use. The plant will process approximately 1450 tonnes of waste annually, with the waste accounting for 90 % of the material used. (English) / rank
 
Normal rank
Property / summary: The object of the project is the construction of a plant for energy use of waste based on the principle of a biogas station associated with the production capacity of the applicant Ing. Karl Horák in Choťovice. The project includes the construction of a specialised digestion tank for bio-waste and other substrate, technology to ensure the function of the biogas station, as well as equipment for cleaning and collecting biogas for further use. The plant will process approximately 1450 tonnes of waste annually, with the waste accounting for 90 % of the material used. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:15, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy recovery installations
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    15,850,810.24 Czech koruna
    0 references
    634,032.41 Euro
    10 January 2020
    0 references
    19,813,512.8 Czech koruna
    0 references
    792,540.51 Euro
    10 January 2020
    0 references
    80 percent
    0 references
    2 June 2019
    0 references
    31 December 2020
    0 references
    Ing. Karel Horák
    0 references
    0 references
    0 references

    50°8'32.89"N, 15°17'10.75"E
    0 references
    28905
    0 references
    Předmětem projektu je výstavba zařízení na energetické využití odpadu na principu bioplynové stanice přidružené k výrobním kapacitám žadatele Ing. Karla Horáka v Choťovicích. Projekt zahrnuje výstavbu specializované vyhnívající nádrže na biologický odpad a další substrát, dále technologii k zajištění funkce bioplynové stanice a dále zařízení na čištění bioplynu a jeho jímání k dalšímu využití. Zařízení zpracuje ročně cca 1450 tun odpadu, přičemž odpad bude tvořit 90% využívaného materiálu. (Czech)
    0 references
    The object of the project is the construction of a plant for energy use of waste based on the principle of a biogas station associated with the production capacity of the applicant Ing. Karl Horák in Choťovice. The project includes the construction of a specialised digestion tank for bio-waste and other substrate, technology to ensure the function of the biogas station, as well as equipment for cleaning and collecting biogas for further use. The plant will process approximately 1450 tonnes of waste annually, with the waste accounting for 90 % of the material used. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.3.29/0.0/0.0/16_041/0004074
    0 references