II/409 UCOERCHO-VRATÍN — ARRNAMES, BRANCH 2 (Q63909): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project lies in the new construction of the missing walkway along communication III/40928 linking the municipality of Vrachnun. The walkway shall be separated from the ground by a road bypass or green band. The width of the walkway shall be 1,50-3.00 m. One place for crossing is proposed for the connection of a pedestrian to an existing walkway route. The implementation of the project will ensure the safety and flow of trans...) |
(Created claim: summary (P836): The object of the project lies in the new construction of the missing pedestrian route along the road III/40928 connecting the village Vratenín with the cemetery. The pavement will be separated from the road by a curb or green belt. The width of the pavement is designed in the value of 1.50-3.00 m. The surface will be made of cement concrete paving with base unmelted layers. For connecting the sidewalk to the existing pedestrian route, one point...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project lies in the new construction of the missing pedestrian route along the road III/40928 connecting the village Vratenín with the cemetery. The pavement will be separated from the road by a curb or green belt. The width of the pavement is designed in the value of 1.50-3.00 m. The surface will be made of cement concrete paving with base unmelted layers. For connecting the sidewalk to the existing pedestrian route, one point for crossing is proposed. The implementation of the project will ensure safety and continuity of transport. (English) | |||||||||||||||
Property / summary: The object of the project lies in the new construction of the missing pedestrian route along the road III/40928 connecting the village Vratenín with the cemetery. The pavement will be separated from the road by a curb or green belt. The width of the pavement is designed in the value of 1.50-3.00 m. The surface will be made of cement concrete paving with base unmelted layers. For connecting the sidewalk to the existing pedestrian route, one point for crossing is proposed. The implementation of the project will ensure safety and continuity of transport. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project lies in the new construction of the missing pedestrian route along the road III/40928 connecting the village Vratenín with the cemetery. The pavement will be separated from the road by a curb or green belt. The width of the pavement is designed in the value of 1.50-3.00 m. The surface will be made of cement concrete paving with base unmelted layers. For connecting the sidewalk to the existing pedestrian route, one point for crossing is proposed. The implementation of the project will ensure safety and continuity of transport. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 18:02, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | II/409 UCOERCHO-VRATÍN — ARRNAMES, BRANCH 2 |
Project in Czech Republic financed by DG Regio |
Statements
1,520,760.98 Czech koruna
0 references
1,600,801.04 Czech koruna
0 references
95.0 percent
0 references
30 April 2020
0 references
Obec Vratěnín
0 references
67107
0 references
Předmět projektu spočívá v novostavbě chybějící chodecké trasy podél komunikace III/40928 spojující obec Vratěnín se hřbitovem. Chodník bude od vozovky oddělen silničním obrubníkem nebo zeleným pásem. Šířka chodníku je navržena v hodnotě 1,50 - 3,00 m. Povrch bude z cementobetonové dlažby s podkladními nestmelenými vrstvami. Pro napojení chodníku na stávající chodeckou trasu je navrženo jedno místo pro přecházení. Realizací projektu bude zajištěna bezpečnost a plynulost dopravy. (Czech)
0 references
The object of the project lies in the new construction of the missing pedestrian route along the road III/40928 connecting the village Vratenín with the cemetery. The pavement will be separated from the road by a curb or green belt. The width of the pavement is designed in the value of 1.50-3.00 m. The surface will be made of cement concrete paving with base unmelted layers. For connecting the sidewalk to the existing pedestrian route, one point for crossing is proposed. The implementation of the project will ensure safety and continuity of transport. (English)
23 October 2020
0 references
Identifiers
CZ.06.4.59/0.0/0.0/16_038/0011965
0 references