(‎Removed claim: summary (P836): The project addresses the effective disposal of waste water through the construction of a wastewater treatment plant with a capacity of 200 equivalent inhabitants. Domestic sewage will be transported to ČOV under pressure sewers. Currently in the municipality of ČOV there is no complete absence. The proposed container is a container certified treatment plant on whole-plastic hamlets., remove_old_english_translation)
(‎Created claim: summary (P836): The project solves an efficient solution of wastewater drainage by building a wastewater treatment plant with a capacity of 200 equivalent inhabitants. Sewage sewage will be transported to the WWTP by pressure sewerage. There is currently a lack of water in the village. A container certified treatment plant in steel-plastic self-supporting tanks is designed., translated_summary)
Property / summary
 
The project solves an efficient solution of wastewater drainage by building a wastewater treatment plant with a capacity of 200 equivalent inhabitants. Sewage sewage will be transported to the WWTP by pressure sewerage. There is currently a lack of water in the village. A container certified treatment plant in steel-plastic self-supporting tanks is designed. (English)
Property / summary: The project solves an efficient solution of wastewater drainage by building a wastewater treatment plant with a capacity of 200 equivalent inhabitants. Sewage sewage will be transported to the WWTP by pressure sewerage. There is currently a lack of water in the village. A container certified treatment plant in steel-plastic self-supporting tanks is designed. (English) / rank
 
Normal rank
Property / summary: The project solves an efficient solution of wastewater drainage by building a wastewater treatment plant with a capacity of 200 equivalent inhabitants. Sewage sewage will be transported to the WWTP by pressure sewerage. There is currently a lack of water in the village. A container certified treatment plant in steel-plastic self-supporting tanks is designed. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:49, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
ČOV Transwishe
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,753,390.07 Czech koruna
    0 references
    70,135.60 Euro
    10 January 2020
    0 references
    2,750,415.8 Czech koruna
    0 references
    110,016.63 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    31 May 2021
    0 references
    Obec Přehvozdí
    0 references
    0 references
    0 references

    49°58'1.06"N, 14°52'2.06"E
    0 references
    28163
    0 references
    Projekt řeší efektivní řešení odvodu odpadních vod vybudováním ČOV s kapacitou 200 ekvivalentních obyvatel. Splaškové odpadní vody budou dopravovány na ČOV tlakovou kanalizací. V současné době v obci ČOV zcela chybí. Navržena je kontejnerová certifikovaná čistírna v oceloplastových samonosných nádržích. (Czech)
    0 references
    The project solves an efficient solution of wastewater drainage by building a wastewater treatment plant with a capacity of 200 equivalent inhabitants. Sewage sewage will be transported to the WWTP by pressure sewerage. There is currently a lack of water in the village. A container certified treatment plant in steel-plastic self-supporting tanks is designed. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_071/0007279
    0 references