Walker along communication III/4222 and to the site For Nephrops (Q63615): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project deals with the construction of a new walkway along the road of Class III 4222, which is going through the municipality of Tupesy. The new walkway will be 309.56 m long and is located in the city centre itself. The walkway will allow the safe access of pedestrians from the site to the school, the kindergarten, the shop office, the mixed goods shop, captcha, the bus stop. the construction of this walkway is designed to ensure the max...) |
||
Property / summary | |||
Property / summary: The project deals with the construction of a new walkway along the road of Class III 4222, which is going through the municipality of Tupesy. The new walkway will be 309.56 m long and is located in the city centre itself. The walkway will allow the safe access of pedestrians from the site to the school, the kindergarten, the shop office, the mixed goods shop, captcha, the bus stop. the construction of this walkway is designed to ensure the maximum safety of transport and the complexity of transport infrastructure in the municipality. (English) / rank | |||
Revision as of 13:53, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Walker along communication III/4222 and to the site For Nephrops |
Project in Czech Republic financed by DG Regio |
Statements
1,038,041.91 Czech koruna
0 references
1,092,675.7 Czech koruna
0 references
95.0 percent
0 references
16 April 2018
0 references
31 December 2018
0 references
31 December 2018
0 references
Obec Tupesy
0 references
68707
0 references
Projekt řeší výstavbu nového chodníku vedoucího podél silnice III. třídy č. 4222, která prochází obcí Tupesy. Nový chodník bude dlouhý 309,56 m a nachází se v samotném centru obce. Chodník umožní bezpečný přístup pěších z této lokality ke škole, školce, obecnímu úřadu, prodejně smíšeného zboží, kaple, autobusové zastávce.Výstavba tohoto chodníku řeší zajištění maximální bezpečnosti dopravy a komplexnost kvalitní dopravní infrastruktury v obci. (Czech)
0 references
Identifiers
CZ.06.4.59/0.0/0.0/16_038/0010758
0 references