Reconstruction of the extraction of the welding hall by Diogo Nýřany a.s. (Q61833): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The renovation project of the welding house will lead to the reduction of dust emissions and to the reduction of fugitive dust emissions from machining and welding of metal parts. The installation of the equipment under assessment should be reduced by approximately 1.031 t/r dust/r PM2,5, or 0.854 t/r PM, which will have a positive impact on the concentration situation in the area. The project is implemented on plot No 2234/1 in the catalside...)
Property / summary
The renovation project of the welding house will lead to the reduction of dust emissions and to the reduction of fugitive dust emissions from machining and welding of metal parts. The installation of the equipment under assessment should be reduced by approximately 1.031 t/r dust/r PM2,5, or 0.854 t/r PM, which will have a positive impact on the concentration situation in the area. The project is implemented on plot No 2234/1 in the catalside of the Nýřany area [708496]. (English)
 
Property / summary: The renovation project of the welding house will lead to the reduction of dust emissions and to the reduction of fugitive dust emissions from machining and welding of metal parts. The installation of the equipment under assessment should be reduced by approximately 1.031 t/r dust/r PM2,5, or 0.854 t/r PM, which will have a positive impact on the concentration situation in the area. The project is implemented on plot No 2234/1 in the catalside of the Nýřany area [708496]. (English) / rank
Normal rank
 

Revision as of 13:05, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the extraction of the welding hall by Diogo Nýřany a.s.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    1,740,615.55 Czech koruna
    0 references
    69,624.62 Euro
    10 January 2020
    0 references
    2,047,783.0 Czech koruna
    0 references
    81,911.32 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    24 March 2017
    0 references
    5 May 2017
    0 references
    31 January 2018
    0 references
    DIOSS NÝŘANY a.s.
    0 references
    0 references

    49°42'40.97"N, 13°13'2.24"E
    0 references

    49°43'8.90"N, 13°11'27.31"E
    0 references
    33023
    0 references
    Projekt rekonstrukce odsávání svařovny povede ke snížení emisí tuhých znečišťujících látek a ke snížení fugitivních emisí TZL, které vznikají při obrábění a svařování kovových dílů. Instalací posuzovaného zařízení by mělo dojít ke snížení emisí z posuzované provozovny o přibližně 1,031 t/r TZL, resp. 0,854 t/r PM2,5, což bude mít příznivý vliv na imisní situaci v oblasti. Realizace projektu probíhá na parc. č. 2234/1 v katastr. území Nýřany [708496]. (Czech)
    0 references

    Identifiers

    CZ.05.2.32/0.0/0.0/15_008/0001076
    0 references