(Removed claim: summary (P836): Replacement of an existing solid fuel boiler in a modern automatic solid fuel boiler meeting the ecodesign requirements. The installation of controls of the PID to modulate power in a given range to sources of heat. The installation of spatial thermostats in the individual zone of heating sectors. Reconstruction of existing distribution of heating water. Installation of thermostatic valves with engine heads and regulatory screwing to individua...) |
(Created claim: summary (P836): Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and...) |
||||||||||||||
Property / summary | |||||||||||||||
Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English) | |||||||||||||||
Property / summary: Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 12:50, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the nursery building — reconstruction of distribution systems for heating and replacement of the boiler |
Project in Czech Republic financed by DG Regio |
Statements
494,449.2 Czech koruna
0 references
824,082.0 Czech koruna
0 references
60 percent
0 references
15 June 2017
0 references
13 August 2018
0 references
30 April 2018
0 references
Obec Bulovka
0 references
46401
0 references
Výměna stávajícího kotle na tuhá paliva za moderní automatický kotel na pevná paliva splňující požadavky na ekodesign. Instalace regulace PID pro modulaci výkonu v daném rozsahu na zdroji tepla. Instalace prostorových termostatů do jednotlivých zón topných úseků. Rekonstrukce stávajících rozvodů topné vody . Instalace termostatických ventilů s hlavicemi a regulačním šroubením na jednotlivá otopná tělesa a hydraulické vyvážení otopné soustavy.č.p.156, p.č. 133 (Czech)
0 references
Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English)
23 October 2020
0 references
Identifiers
CZ.05.2.32/0.0/0.0/15_008/0001014
0 references