Reconstruction of the nursery building — reconstruction of distribution systems for heating and replacement of the boiler (Q61732): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Replacement of an existing solid fuel boiler in a modern automatic solid fuel boiler meeting the ecodesign requirements. The installation of controls of the PID to modulate power in a given range to sources of heat. The installation of spatial thermostats in the individual zone of heating sectors. Reconstruction of existing distribution of heating water. Installation of thermostatic valves with engine heads and regulatory screwing to individua...)
(‎Created claim: summary (P836): Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and...)
Property / summary
 
Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English)
Property / summary: Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English) / rank
 
Normal rank
Property / summary: Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:50, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the nursery building — reconstruction of distribution systems for heating and replacement of the boiler
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    494,449.2 Czech koruna
    0 references
    19,777.97 Euro
    10 January 2020
    0 references
    824,082.0 Czech koruna
    0 references
    32,963.28 Euro
    10 January 2020
    0 references
    60 percent
    0 references
    15 June 2017
    0 references
    13 August 2018
    0 references
    30 April 2018
    0 references
    Obec Bulovka
    0 references
    0 references
    0 references

    50°55'29.35"N, 15°5'36.96"E
    0 references
    46401
    0 references
    Výměna stávajícího kotle na tuhá paliva za moderní automatický kotel na pevná paliva splňující požadavky na ekodesign. Instalace regulace PID pro modulaci výkonu v daném rozsahu na zdroji tepla. Instalace prostorových termostatů do jednotlivých zón topných úseků. Rekonstrukce stávajících rozvodů topné vody . Instalace termostatických ventilů s hlavicemi a regulačním šroubením na jednotlivá otopná tělesa a hydraulické vyvážení otopné soustavy.č.p.156, p.č. 133 (Czech)
    0 references
    Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.2.32/0.0/0.0/15_008/0001014
    0 references