Q61666 (Q61666): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The object of the project is to disconnect the existing non-compliant heat source from the steam boiler room and replace it with 3 local gas condensing boilers, which will be located in the production hall (a boiler with a rated output of 350 kW), a boiler and an administrative building (2 boilers, each with a rated output of 45 kW). The project envisages small building modifications necessary for the installation of new heat sources. In additio...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 12:49, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
2,316,593.04 Czech koruna
0 references
3,860,988.41 Czech koruna
0 references
60.0 percent
0 references
28 June 2017
0 references
30 June 2019
0 references
ASTRO Vlašim spol. s r.o.
0 references
25801
0 references
Předmětem projektu je odpojení stávajícího nevyhovujícího zdroje tepla z parní kotelny a jeho náhrada 3 místními plynovými kondenzačními kotly, které se budou nacházet ve výrobní hale (kotel o jmenovitém výkonu 350 kW), kotelně a administrativní budově (2 kotle, každý o jmenovitém výkonu 45 kW). V rámci projektu se počítá s drobnými stavebními úpravami nutnými pro instalaci nových zdrojů tepla. Dále bude provedena nová otopná soustava - dvoutrubková teplovodní s novými deskovými otopnými tělesy. (Czech)
0 references
The object of the project is to disconnect the existing non-compliant heat source from the steam boiler room and replace it with 3 local gas condensing boilers, which will be located in the production hall (a boiler with a rated output of 350 kW), a boiler and an administrative building (2 boilers, each with a rated output of 45 kW). The project envisages small building modifications necessary for the installation of new heat sources. In addition, a new heating system – two-tube hot water with new plate heating elements will be implemented. (English)
23 October 2020
0 references
Identifiers
CZ.05.2.32/0.0/0.0/15_008/0000982
0 references