Acquisition of additional technologies to reduce pollution by emissions from the shaft furnace (Q61536): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Acquisition of additional technologies to reduce pollution by emissions from the shaft furnace |
Revision as of 12:46, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Acquisition of additional technologies to reduce pollution by emissions from the shaft furnace |
Project in Czech Republic financed by DG Regio |
Statements
19,255,678.75 Czech koruna
0 references
35,010,325.0 Czech koruna
0 references
55 percent
0 references
23 May 2016
0 references
18 August 2016
0 references
31 May 2017
0 references
Kovohutě Příbram nástupnická, a.s.
0 references
26101
0 references
V rámci projektu dojde k pořízení dodatečné technologie ke snížení znečištění emisemi ze šachtové pece. Budou realizovány stavební a technologické objekty zahrnující filtr šachtové pece a dohořívací věž vč. základů. Realizovaná opatření výraznou měrou přispějí mj. ke snížení TZL a SO2 a to nad rámce norem EU dle čl. 36. Stavba je navržena v souladu s ÚP, umístění nového filtračního a odsiřovacího zařízení bude ve stávajícím areálu žadatele. Projekt je v souladu s PO 2, SC 2.2 v rámci OPŽP. (Czech)
0 references
As part of the project, additional technology will be acquired to reduce pollution by emissions from the shaft furnace. Building and technological objects including shaft furnace filter and burning tower including foundations will be implemented. The measures implemented will significantly contribute, inter alia, to the reduction of TZL and SO2 above the framework of EU standards in accordance with Article 36. The construction is designed in accordance with the ÚP, the location of the new filtration and desulphurisation facility will be on the current premises of the applicant. The project is in accordance with PO 2, SC 2.2 within the OPE. (English)
23 October 2020
0 references
Identifiers
CZ.05.2.32/0.0/0.0/15_008/0000001
0 references