(Removed claim: summary (P836): The subject of the subsidy is the replacement of an existing hand-filled boiler as an automatic boiler meeting the parameters of eco-design. Furthermore, as part of the subsidy, the planned completion of the heating system at the premises of the establishment, which is currently not heated and where no distribution or distribution is made, would be carried out. at the same time, partial refurbishment of the heating system in existing heated ar...) |
(Created claim: summary (P836): The purpose of the subsidy is to replace the existing manually filled boiler with an automatic boiler fulfilling the parameters of Ekodesign.The subsidy also anticipates completion of the heating system in the premises of an establishment that is currently not heated and where neither manifolds or radiators are installed. National class 302, 793 12 Horní Benešov, parcel number 1180/1, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The purpose of the subsidy is to replace the existing manually filled boiler with an automatic boiler fulfilling the parameters of Ekodesign.The subsidy also anticipates completion of the heating system in the premises of an establishment that is currently not heated and where neither manifolds or radiators are installed. National class 302, 793 12 Horní Benešov, parcel number 1180/1 (English) | |||||||||||||||
Property / summary: The purpose of the subsidy is to replace the existing manually filled boiler with an automatic boiler fulfilling the parameters of Ekodesign.The subsidy also anticipates completion of the heating system in the premises of an establishment that is currently not heated and where neither manifolds or radiators are installed. National class 302, 793 12 Horní Benešov, parcel number 1180/1 (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The purpose of the subsidy is to replace the existing manually filled boiler with an automatic boiler fulfilling the parameters of Ekodesign.The subsidy also anticipates completion of the heating system in the premises of an establishment that is currently not heated and where neither manifolds or radiators are installed. National class 302, 793 12 Horní Benešov, parcel number 1180/1 (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 12:39, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement of lignite boilers + accessories |
Project in Czech Republic financed by DG Regio |
Statements
386,386.8 Czech koruna
0 references
643,978.0 Czech koruna
0 references
60 percent
0 references
1 December 2019
0 references
Josef Fajtl
0 references
79312
0 references
Předmětem dotace je výměna stávajícího ručně plněného kotle za automatický kotel splňující parametry Ekodesignu.Dále se v rámci dotace předpokláda dokončení otopné soustavy v prostorách provozovny, které nejsou v současné době vytápěny a kde nejsou instalovány ani rozvody ani radiátory.Současně by proběhla i částečná rekonstrukce otopné soustavy ve stávajících vytápěných prostorách. Národní třída 302, 793 12 Horní Benešov, parcelní číslo 1180/1 (Czech)
0 references
The purpose of the subsidy is to replace the existing manually filled boiler with an automatic boiler fulfilling the parameters of Ekodesign.The subsidy also anticipates completion of the heating system in the premises of an establishment that is currently not heated and where neither manifolds or radiators are installed. National class 302, 793 12 Horní Benešov, parcel number 1180/1 (English)
23 October 2020
0 references
Identifiers
CZ.05.2.28/0.0/0.0/19_136/0009953
0 references