K. ú. Department of Peace for Cyranic — cycle paths on c. no 580/1, 580/2 and 580/3 (Q62993): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project deals with the construction of a cycle path in the municipality of Scalička, linked to the existing cycle path (inline) in the Municipality of Ústí. This will result in a connection between the two municipalities and the transfer of the cyclocorrections from Class III road 4392 to the cycle path. This will result in safe cycling, with the possibility of being used in the labour force, in the school, in services, for leisure activit...)
(‎Created claim: summary (P836): The project solves the construction of a cycle path in the village of Skalička with connection to the existing cycle path (in-line track) in the village of Ústí. This will result in the connection of these two villages and the transport of cycling from the III. class 4392 road to the bike path. This will create safe cycling transport with the possibility of using in the drive to work, to school, for services, for leisure activities. The cycle pa...)
Property / summary
 
The project solves the construction of a cycle path in the village of Skalička with connection to the existing cycle path (in-line track) in the village of Ústí. This will result in the connection of these two villages and the transport of cycling from the III. class 4392 road to the bike path. This will create safe cycling transport with the possibility of using in the drive to work, to school, for services, for leisure activities. The cycle path will be 1.447 km long. (English)
Property / summary: The project solves the construction of a cycle path in the village of Skalička with connection to the existing cycle path (in-line track) in the village of Ústí. This will result in the connection of these two villages and the transport of cycling from the III. class 4392 road to the bike path. This will create safe cycling transport with the possibility of using in the drive to work, to school, for services, for leisure activities. The cycle path will be 1.447 km long. (English) / rank
 
Normal rank
Property / summary: The project solves the construction of a cycle path in the village of Skalička with connection to the existing cycle path (in-line track) in the village of Ústí. This will result in the connection of these two villages and the transport of cycling from the III. class 4392 road to the bike path. This will create safe cycling transport with the possibility of using in the drive to work, to school, for services, for leisure activities. The cycle path will be 1.447 km long. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:35, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
K. ú. Department of Peace for Cyranic — cycle paths on c. no 580/1, 580/2 and 580/3
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,746,141.65 Czech koruna
    0 references
    149,845.67 Euro
    1 October 2020
    0 references
    3,943,307.0 Czech koruna
    0 references
    157,732.28 Euro
    1 October 2020
    0 references
    95 percent
    0 references
    30 November 2019
    0 references
    Obec Skalička
    0 references
    0 references

    49°30'56.9"N, 17°47'44.9"E
    0 references
    75352
    0 references
    Projekt řeší vybudování cyklostezky v obci Skalička s napojením na stávající cyklostezku (in-line dráhu) v obci Ústí. Dojde tak k propojení těchto dvou obcí a odvedení cyklodopravy ze silnice III. třídy 4392 na cyklostezku. Vznikne tak bezpečná cyklodoprava s možností využití v dojezdu do práce, do školy, za službami, k volnočasovým aktivitám. Cyklostezka bude mít délku 1,447 km. (Czech)
    0 references
    The project solves the construction of a cycle path in the village of Skalička with connection to the existing cycle path (in-line track) in the village of Ústí. This will result in the connection of these two villages and the transport of cycling from the III. class 4392 road to the bike path. This will create safe cycling transport with the possibility of using in the drive to work, to school, for services, for leisure activities. The cycle path will be 1.447 km long. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0008437
    0 references