Q60331 (Q60331): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Sewerage and wastewater treatment plant under Hostýnem

Revision as of 12:13, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    11,876,598.93 Czech koruna
    0 references
    475,063.96 Euro
    10 January 2020
    0 references
    18,629,959.11 Czech koruna
    0 references
    745,198.36 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    10 July 2018
    0 references
    31 December 2020
    0 references
    Vodovody a kanalizace Kroměříž, a.s.
    0 references
    0 references

    49°17'19.03"N, 17°23'24.36"E
    0 references
    76701
    0 references
    Účelem projektu je v Hlinsku pod Hostýnem výstavba nové kanalizace a podchycení stávající jednotné kanalizace se svedením do nově navržené čerpací stanice ČS1 s následným přečerpáním odpadních vod (v I.etapě pro 55% jižní zástavby) na novou čistírnu ČOV, umístěnou v k.ú. Hlinsko pod Hostýnem - p. č. 970/23 a 970/13. Zde bude probíhat mechanicko-biologické čištění OV a vyčištěná odpadní voda z ČOV bude vypouštěna výpustným objektem kanalizace do recipientu Slavkovský potok. (Czech)
    0 references
    The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV and the purified waste water from the WWTP will be discharged by the drainage facility into the receiving Slavkovský creek. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004713
    0 references