Ponds — Intensification of the water supply (Q61387): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The present project proposes an increase in the total length of 898.42 m for the connection of the current project to the connection of new demand points. The existing water supply is built predominantly in the 70s. because of insufficient dimensions, it is not possible to link additional properties and, because of poor performance, there is a high failure to produce significant water losses. The implementation of the project will make an esse...)
(‎Created claim: summary (P836): The submitted project proposes an intensification of the water supply with a total length of 898.42 m. Implementation of the project to connect new sampling points. The existing water supply is built mainly in the 70s. Due to insufficient dimensions, it does not allow for connection of other properties and because of poor performance it shows a high failure due to significant water losses. The implementation of the project will have a fundamenta...)
Property / summary
 
The submitted project proposes an intensification of the water supply with a total length of 898.42 m. Implementation of the project to connect new sampling points. The existing water supply is built mainly in the 70s. Due to insufficient dimensions, it does not allow for connection of other properties and because of poor performance it shows a high failure due to significant water losses. The implementation of the project will have a fundamental contribution to environmental protection. (English)
Property / summary: The submitted project proposes an intensification of the water supply with a total length of 898.42 m. Implementation of the project to connect new sampling points. The existing water supply is built mainly in the 70s. Due to insufficient dimensions, it does not allow for connection of other properties and because of poor performance it shows a high failure due to significant water losses. The implementation of the project will have a fundamental contribution to environmental protection. (English) / rank
 
Normal rank
Property / summary: The submitted project proposes an intensification of the water supply with a total length of 898.42 m. Implementation of the project to connect new sampling points. The existing water supply is built mainly in the 70s. Due to insufficient dimensions, it does not allow for connection of other properties and because of poor performance it shows a high failure due to significant water losses. The implementation of the project will have a fundamental contribution to environmental protection. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:09, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Ponds — Intensification of the water supply
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,731,371.05 Czech koruna
    0 references
    109,254.84 Euro
    10 January 2020
    0 references
    4,284,503.61 Czech koruna
    0 references
    171,380.14 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    25 September 2017
    0 references
    17 January 2020
    0 references
    Obec Rybníky
    0 references
    0 references
    0 references

    49°45'41.80"N, 14°11'31.67"E
    0 references
    26301
    0 references
    Předkládaný projekt navrhuje intenzifikaci vodovodu ve celkové délce 898,42 m. Realizací projektu k napojení nových odběrných míst. Stávající vodovod je vybudovaný převážně v 70-tých letech minulého století. vzhledem k nedostačujícím dimenzím neumožňuje napojení dalších nemovitostí a z důvodu nekvalitního provedení vykazuje vysokou poruchovost s důsledkem značných ztrát vody. Realizace projektu bude mít zásadní přínos pro ochranu životního prostředí. (Czech)
    0 references
    The submitted project proposes an intensification of the water supply with a total length of 898.42 m. Implementation of the project to connect new sampling points. The existing water supply is built mainly in the 70s. Due to insufficient dimensions, it does not allow for connection of other properties and because of poor performance it shows a high failure due to significant water losses. The implementation of the project will have a fundamental contribution to environmental protection. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_073/0007295
    0 references