Continuation of the walkway in ul. Vysočina (Q62484): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The objective of the project is the creation of a missing pedestrian communication, which will ensure the accessibility of the industrial zone and of the local parts of Dvorko and Nořín. This objective will be achieved by building a corridor (continuation of the walkway) in ul. The Vysočina region of the associated transport area of the road traffic passage area II/357, which will be separated from the traffic area by a green belt. The length...) |
(Created claim: summary (P836): The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English) | |||||||||||||||
Property / summary: The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 12:04, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Continuation of the walkway in ul. Vysočina |
Project in Czech Republic financed by DG Regio |
Statements
1,175,992.73 Czech koruna
0 references
1,237,887.09 Czech koruna
0 references
95.0 percent
0 references
1 October 2017
0 references
30 June 2019
0 references
30 June 2019
0 references
Město Choceň
0 references
56501
0 references
Cílem projektu je vytvoření chybějící komunikace pro pěší, která zajistí pěší dostupnost průmyslové zóny a místních částí Dvořisko a Nořín. Tohoto cíle bude dosaženo výstavbou chodníku (pokračováním chodníku) v ul. Vysokomýtská v přidruženém dopravním prostoru průjezdního úseku silnice II/357, který bude od hlavního dopravního prostoru oddělen zeleným pásem. Délka navrhovaného chodníku je 330,62m, Šířka chodníku je v celé délce navržena v minimální hodnotě 1,75m. (Czech)
0 references
The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English)
23 October 2020
0 references
Identifiers
CZ.06.4.59/0.0/0.0/16_038/0007174
0 references