Extension of the Hošťálková water supply – in Selcoch (Q60167): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Extension of the Hošťálková water supply – in Selcoch |
Revision as of 11:44, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the Hošťálková water supply – in Selcoch |
Project in Czech Republic financed by DG Regio |
Statements
3,924,864.37 Czech koruna
0 references
6,156,650.0 Czech koruna
0 references
63.75 percent
0 references
21 July 2016
0 references
21 February 2017
0 references
21 August 2017
0 references
Obec Hošťálková
0 references
75622
0 references
Navržený projekt řeší posílení obecního vodovodu pomocí dvou nových vrtaných studní o hloubce 80 m, vybudováním přiváděcího řadu do nového vodojemu o objemu 50 m3, ve kterém bude voda upravována a hygienicky zabezpečena a odtud vedena gravitačně zásobovacím řadem do stávající rozvodné vodovodní sítě. Zdroje vody vykazují stabilní vydatnost cca 0,6 l/s. Posílení kapacity vodovodu se týká cca 1732 obyvatel z celkového počtu 2206. (Czech)
0 references
The proposed project solves the strengthening of the municipal water supply by using two new drilled wells with a depth of 80 m, by constructing an intake series into a new 50 m³ water reservoir, in which the water will be treated and hygienically secured and then led through the gravitationally supply line to the existing water supply network. Water sources show a stable yield of about 0.6 l/s. Reinforcing the water supply capacity concerns about 1732 inhabitants out of the total 2206. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.30/0.0/0.0/15_022/0001329
0 references