The street sweeper is rarer in the cadastral district. Jars (s) (Q59354): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim of the project is to carry out remediation actions on a site with high risk of injury to persons and damage to property caused by an enlarged stone. The rehabilitation measures will prevent the further fall of the rock and thus protect the property and health of individuals. Once completed, the main visible features will only be wood papiliades and steel nets in the rocky outcrop area. The clean-up carried out will not have a major imp...) |
(Created claim: summary (P836): The aim of the project is to implement remediation measures in the locality with high risk in terms of the possibility of personal injury and damage to property caused by weathered stone. The remediation measure will prevent further fall of the rock and thus ensure the protection of property and health of persons. Upon completion, the main visible elements will be only wooden palisades and steel nets in the rock outpost area. The remediation car...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to implement remediation measures in the locality with high risk in terms of the possibility of personal injury and damage to property caused by weathered stone. The remediation measure will prevent further fall of the rock and thus ensure the protection of property and health of persons. Upon completion, the main visible elements will be only wooden palisades and steel nets in the rock outpost area. The remediation carried out will not have a major impact on the perception of rock slopes and exits or on the significant site concerned. (English) | |||||||||||||||
Property / summary: The aim of the project is to implement remediation measures in the locality with high risk in terms of the possibility of personal injury and damage to property caused by weathered stone. The remediation measure will prevent further fall of the rock and thus ensure the protection of property and health of persons. Upon completion, the main visible elements will be only wooden palisades and steel nets in the rock outpost area. The remediation carried out will not have a major impact on the perception of rock slopes and exits or on the significant site concerned. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to implement remediation measures in the locality with high risk in terms of the possibility of personal injury and damage to property caused by weathered stone. The remediation measure will prevent further fall of the rock and thus ensure the protection of property and health of persons. Upon completion, the main visible elements will be only wooden palisades and steel nets in the rock outpost area. The remediation carried out will not have a major impact on the perception of rock slopes and exits or on the significant site concerned. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 11:41, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The street sweeper is rarer in the cadastral district. Jars (s) |
Project in Czech Republic financed by DG Regio |
Statements
2,190,917.5 Czech koruna
0 references
2,577,550.0 Czech koruna
0 references
85 percent
0 references
11 September 2019
0 references
30 September 2020
0 references
Statutární město Brno
0 references
60200
0 references
Cílem projektu je provedení sanačních opatření v lokalitě s vysokou rizikovostí z hlediska možnosti zranění osob a vzniku škod na majetku spadem zvětralého kamene. Sanačním opatřením dojde k zabránění dalšímu pádu horniny a tím se zajistí ochrana majetku a zdraví osob. Po dokončení budou hlavními viditelnými prvky pouze dřevěné palisády a ocelové sítě v ploše skalního výchozu. Provedená sanace nebude mít zásadní vliv na vnímání skalních svahů a výchozů a ani na dotčenou významnou lokalitu. (Czech)
0 references
The aim of the project is to implement remediation measures in the locality with high risk in terms of the possibility of personal injury and damage to property caused by weathered stone. The remediation measure will prevent further fall of the rock and thus ensure the protection of property and health of persons. Upon completion, the main visible elements will be only wooden palisades and steel nets in the rock outpost area. The remediation carried out will not have a major impact on the perception of rock slopes and exits or on the significant site concerned. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/18_101/0009075
0 references