Sky-keeping supplies between CHLOV and Vrovicky in Úpke — Stage A (Q59348): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The purpose of a building is to avoid scalding and to ensure the stability of the rock mass between the rebuilding of the Chelčicko-Lhenicko area and the Vrhatic in Údog’s land division (cadastral district) No 526/3 (cadastral district). Úpice). At present, there are sometimes spontaneous loss of stones and rocks from the rock mass. The drop in energy released by the bedrock jeopardises traffic in the aftermath of the Chelčicko-Lhenicko area....)
Property / summary
The purpose of a building is to avoid scalding and to ensure the stability of the rock mass between the rebuilding of the Chelčicko-Lhenicko area and the Vrhatic in Údog’s land division (cadastral district) No 526/3 (cadastral district). Úpice). At present, there are sometimes spontaneous loss of stones and rocks from the rock mass. The drop in energy released by the bedrock jeopardises traffic in the aftermath of the Chelčicko-Lhenicko area. The total level of the static collateral area is 232 m². (English)
 
Property / summary: The purpose of a building is to avoid scalding and to ensure the stability of the rock mass between the rebuilding of the Chelčicko-Lhenicko area and the Vrhatic in Údog’s land division (cadastral district) No 526/3 (cadastral district). Úpice). At present, there are sometimes spontaneous loss of stones and rocks from the rock mass. The drop in energy released by the bedrock jeopardises traffic in the aftermath of the Chelčicko-Lhenicko area. The total level of the static collateral area is 232 m². (English) / rank
Normal rank
 

Revision as of 11:41, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Sky-keeping supplies between CHLOV and Vrovicky in Úpke — Stage A
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,118,782.79 Czech koruna
    0 references
    44,751.31 Euro
    10 January 2020
    0 references
    1,316,215.05 Czech koruna
    0 references
    52,648.60 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2020
    0 references
    MĚSTO ÚPICE
    0 references
    0 references
    0 references

    50°30'38.99"N, 16°0'50.22"E
    0 references
    54232
    0 references
    Účelem stavby je zamezit skalnímu řícení a zajistit stabilitu skalního masivu mezi ulicí Chelčického a Vrchlického v Úpici na pozemku p.p.č. 526/3 (k.ú. Úpice). V současné době občas dochází k samovolnému vypadávání kamenů a bloků ze skalního masivu. Pádová energie uvolněných skalních částí ohrožuje provoz po komunikaci mezi ulicí Chelčického a Vrchlického. Celková půdorysná plocha statického zajištění je 232 m2. (Czech)
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/18_101/0009038
    0 references