Flood Protection — Vernéřov (Q58062): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project content is an increase in the flood protection of the parts of the city of Aš — Vernéřov and Dolni Pasects, the reconstruction of the security capacity at the pond Vernerov lying on the Bílý Halštrov stream, to p.p.č.795/3 in the cadastral district. Vernéřov u Alo., remove_old_english_translation)
(‎Created claim: summary (P836): The project includes an increase in flood protection of the part of Aš – Vernéřov and Dolní Paseky, reconstruction of the safety overflow on the Vernéřov pond lying on the river Bílý Halštrov, on p.p.no.795/3 v k.ú. Vernerov near Aš., translated_summary)
Property / summary
 
The project includes an increase in flood protection of the part of Aš – Vernéřov and Dolní Paseky, reconstruction of the safety overflow on the Vernéřov pond lying on the river Bílý Halštrov, on p.p.no.795/3 v k.ú. Vernerov near Aš. (English)
Property / summary: The project includes an increase in flood protection of the part of Aš – Vernéřov and Dolní Paseky, reconstruction of the safety overflow on the Vernéřov pond lying on the river Bílý Halštrov, on p.p.no.795/3 v k.ú. Vernerov near Aš. (English) / rank
 
Normal rank
Property / summary: The project includes an increase in flood protection of the part of Aš – Vernéřov and Dolní Paseky, reconstruction of the safety overflow on the Vernéřov pond lying on the river Bílý Halštrov, on p.p.no.795/3 v k.ú. Vernerov near Aš. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:33, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Flood Protection — Vernéřov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,392,794.91 Czech koruna
    0 references
    175,711.80 Euro
    10 January 2020
    0 references
    5,167,994.02 Czech koruna
    0 references
    206,719.76 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2017
    0 references
    3 April 2018
    0 references
    30 November 2018
    0 references
    Město Aš
    0 references
    0 references
    0 references

    50°13'25.64"N, 12°11'53.34"E
    0 references
    35201
    0 references
    Obsahem projektu je zvýšení protipovodňové ochrany části města Aš - Vernéřov a Dolní Paseky, rekonstrukcí bezpečnostního přelivu na rybníce Vernéřov ležícího na toku Bílý Halštrov, na p.p.č.795/3 v k.ú. Vernéřov u Aše. (Czech)
    0 references
    The project includes an increase in flood protection of the part of Aš – Vernéřov and Dolní Paseky, reconstruction of the safety overflow on the Vernéřov pond lying on the river Bílý Halštrov, on p.p.no.795/3 v k.ú. Vernerov near Aš. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_034/0002335
    0 references