TŘEBOŇ, OLD GUARD — SEWERAGE SYSTEM AND WASTEWATER TREATMENT PLANT (Q59912): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the construction of ČOV and the sewage system (with one service station) in Staré guarded, the local area of Třebose. 243 permanent living population will be linked to the new sewerage system. The wastewater treatment plant is designed with a capacity of 304 EO., remove_old_english_translation)
(‎Created claim: summary (P836): The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO., translated_summary)
Property / summary
 
The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English)
Property / summary: The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English) / rank
 
Normal rank
Property / summary: The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:21, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
TŘEBOŇ, OLD GUARD — SEWERAGE SYSTEM AND WASTEWATER TREATMENT PLANT
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    12,998,436.93 Czech koruna
    0 references
    519,937.48 Euro
    10 January 2020
    0 references
    20,389,705.0 Czech koruna
    0 references
    815,588.20 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    1 October 2016
    0 references
    31 March 2019
    0 references
    Město Třeboň
    0 references
    0 references
    0 references

    49°1'12.61"N, 14°45'44.53"E
    0 references
    37901
    0 references
    Obsahem projektu je výstavba ČOV a splaškové kanalizace (s jednou čerpací stanicí) ve Staré Hlíně - místní části města Třeboně. Na novou kanalizaci bude napojeno 243 trvale žijících obyvatel. ČOV je navržena o kapacitě 304 EO. (Czech)
    0 references
    The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/15_021/0001266
    0 references